Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Donald L. Otter <br />~e~eral Manager o~ l. andfills <br />Omega Mills l~ndfill <br />De~ember ~, ~98~ <br />~age 3 <br /> <br />COST OF RESTORATION <br /> <br />~estoration for the South BO Borrow Area will consist of grading, topsoil place- <br />ment, seeding, and fe{tilizing. The cost of grading and topsoil placement <br />typically is $1.50/yd~. Assuming a four inch topsoil layer, the oust for <br />grading and topsoil placement would be approximately $800.00 per acre. The <br />typical cost for seeding, and fertilizing, is approximately $1,000.00 per acre. <br />Therefore, the total cost of restoration would be $1,800.00 per acre. <br /> <br />SAFETY CONSIDERATIONS <br /> <br />Mining in the South 80 Borrow Area is planned so as not to be harmful or <br />injurious to the health and welfare of the general public. All side slopes have <br />been designe~ at a maximum slope of 4:1. No shear cuts should exist at any time <br />during the life of the borrow area. <br /> <br />We are confident that the proposed borrow and restoration plan for the South 80 <br />area will meet the approval of the City. Please contact us if we can be of <br />further assistance to you. <br /> <br />Very truly yours, <br /> <br />FOTH & VAN DYKE Industrial, Inc. <br /> <br /> evick, P.E. <br />Assoclat% <br />General Manager, Waste/Energy Division <br /> <br />JWS:smb <br /> <br />CC: <br /> <br />Terry Miller, WMMI - w/enclosure <br />Henry A. Koch, P.E., WMWI - w/enclosure <br />Edward M. Moersfelder, ~D - w/enclosure <br />George W. Boyer, P.E., EAH - w/enclosure <br /> <br /> <br />