My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/26/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 02/26/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:07:21 AM
Creation date
8/3/2004 11:00:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/26/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
minimum~ <br /> <br />4) Vegetative screening shall be utilized to <br />the maximum extent consistent with safety re- <br />gui r~nents ~ <br /> <br />5) Routing shall avoid unstable soils, bluff- <br />lines or high ridges, the alteration of the <br />natural environment, including grading, shall <br />be minimized; and <br /> <br />6) The crossings shall be subject to the <br />site planning requirements set forth in <br />Article <br /> <br />c) Utility Substantions. Utility substations <br />shall be subject to the following standards: <br /> <br />1) All substations shall be subject to the <br />site planning requirements set forth in <br />Article ,.,.; and <br /> <br />2) New substitutions or refurbishment of <br />existing substations shall be compatible in <br />height, scale, building materials, landdscap- <br />lng and signing with the surrounding natural <br />environment or land uses. Screening by <br />natural means is encouraged and should be <br />compatible with the surrounding environment. <br /> <br />d) Pipelines. Pipelines and underground utility <br />facilities shall be subject to the following stand- <br />ards: <br /> <br />1) All pipelines and underground facilities <br />shall be subject to the site planning require- <br />ments set forth in Article <br /> <br />2) The facilities shall be located to avoid <br />wetlands, woodlands and areas of unstable <br />soils; and <br /> <br />3) All underground placing of utility facili- <br />ties and pipelines shall be followed by reveg- <br />etation and rehabilitation to the conditions <br />which existed on site prior to development. <br /> <br />2) Public and Private Roads and Railways. New roads <br />and railways crossing the Critical Area Corridor or <br />routed within the Critical Area Corridor shall meet the <br />following standards: <br /> <br />a) Roads and railways shall be constructed to rain- <br /> Ordinance 185- <br /> <br />Page 27 of 31 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.