My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/25/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 06/25/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:37:52 AM
Creation date
8/3/2004 2:13:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/25/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />"~~ rx~~'"~ 0 F ANOKA <br /> <br />Office of the County Board of Commissioners <br /> <br />COURTHOUSE ANOKA, MINNESOTA 55303 612-421-4760 <br /> <br />Mr. Edward Moersfelder <br />Leonard, Street & Moersfelder <br />1200 National City Bank Building <br />510 Marquette Avenue <br />Minneapolis, MN 55402 <br /> <br />Dear M~'. Moersfelder: <br /> <br />June 20, 1985 <br /> <br />Reference is mode to your recent request to lift the development limitation <br />on a portion of Inventory Site P. <br /> <br />Our review of this request with our consultant has identified several <br />questions. In order to permit the fairest possible evaluation of this request <br />by the County, we would appreciate it if you would provide us with some <br />additional information. These areas of concern are os follows: <br /> <br />The quantity of soil needed for doily cover seems to be too high <br />for the amount of fill capacity remaining. Please provide <br />information identifying how this figure was determined. <br /> <br />The proposed excavation in the "South 80 Borrow" oreo may <br />encroach within $ feet of the highest known water table. Soil <br />borings (to identify mottled soils and water table measurements in <br />the southerly portion of the "South 80 Borrow" oreo should be <br />provided. <br /> <br />If Site P were selected for development, the proposed excavation <br />elevations in the "South 80 Borrow" area may be too deep for the <br />construction of liners, leochote collection and liner monitoring <br />systems. Without a specific design concept, it is not possible to <br />determine jf the proposed elevations are acceptable. Please <br />provide information concerning possible Site P development <br />concept that would support such elevations and would provide for <br />the construction and proper operation of liners, leachate <br />collections, and liner monitoring systems. <br /> <br />You indicate in your request that sufficient soils would remain on <br />the site, after removal of soils from the "South 80 Borrow" area, <br />for the operation of a landfill at Site P. Please identify the <br />quantity of soils that would be needed for the development and <br />operation of Site P and the source of these soils. <br /> <br />Affirmative Action / Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.