Laserfiche WebLink
ity of Ramsey <br /> 15153 Nowt.hen Boulevard <br /> 55303 <br />am_~y, MN <br /> <br />raRe:Flint.wood Hills 2r~J Addition <br /> Contract.or: Arcon Construction Company, Inc. <br />I Bid Anount: $417,573.05 <br />Award Date: June 26, 1985 <br /> Co~plet. ion Date: September 12, 1985 <br /> Percent. Completed: 92% <br /> <br /> Dear Board Members: <br /> <br />~_e following work has been co(npleted on the above referenced project, by Arcon Construction <br /> Coa~pany, Inc. <br /> <br />L[EDULE "A" - SANITARY SEWER/FLINTWOOD HILLS 2ND ADDITION (Improv. Proj. 84-1) <br /> Estimated Used <br /> item Depth Quantity To Date Unit Price <br /> <br />Extension <br /> <br /> 1.8" Pipe <br /> 2.8" Pipe <br /> 3.8" Pipe <br /> 4.Connect to Drop Manhole <br /> 5. Standard Manholes <br /> 6.Extra Depth of Manhole <br /> Over 10 Feet <br /> 7.Adjust Existing Manhole <br /> 8.Crush Rock for Bedding <br /> 9.4" Service Connection <br /> 10.Drop Service Connection into <br /> Manhole <br />11.4" Service Pipe <br />12.6" Service Pipe <br />13.8" Plug <br /> 14.6" Plug <br /> 15. Pipe Testing <br /> <br />0-10 1400 Linear Feet 1372 /[F $12.70 /IF <br />10-12 100 Linear Feet 100 /LF $12.70 /IF <br />18-20 80 Linear Feet 75 /LF $42.40 /IF <br /> 4 Each 4 /FA $100.00 /EA <br /> 7 Each 7 /EA $850.00 /EA <br /> <br />2 Linear Feet 1.4 /LF $50.00 /LF <br />7 Each 7 /FA $200.00 /EA <br />100Ton /T $0.10 /T <br />37 Each 38 /EA $40.00 /EA <br /> <br />$17,424.40 <br /> $1,270.00 <br /> $3,180.00 <br /> $400.00 <br /> <br />$1,520.O0 <br /> <br /> 1 Each /EA $150.00 /FA $0.00 <br />1400 Linear Feet 1754 /IF $5.60 /IF $9,822.40 <br />20 Linear Feet /LF $8.30 /IF $0.00 <br />2 Each 3 /EA $25.00 /EA $75.00 <br />1 Each /FA $25. O0 /FA $0. O0 <br />1580 Linear Feet /LF $0.20 /IF $0.00 <br /> <br />TOTAL SCHEDULE "A": $41,111.80 <br /> <br /> <br />