Mr. Daniel A. Comeau <br />September 25, 19~1!, <br />Page Fourteen <br /> <br />and QA/QC Plan and associated addenda. For the sake of discussion, if <br />it is assumed %hat the submitted reports will be approved October 1, <br />then the Final Report will be due February 1, 1986. A significant portion <br />of the Remedial Investigation has already been completed at this time. <br />The reference to the completion date of December 1985 was made based on an <br />earlier time estimate and included other commitments outside the Consent <br />Order requirements. <br /> <br />Twenty-two groundwater monitoring wells were installed during February <br />and March 1985. After resolving some problems with sampling equipment, <br />water sampling events have been conducted July 22-26 and August 28-30. <br />A third sampling event is scheduled to take place as soon as water quality <br />data from the second sampling event can be reviewed and evaluated. A <br />drilling program consisting of four additional groundwater monitoring <br />wells (which was approved by MPCA) was initiated September 12, 1985. <br /> <br />It is possible that additional supplementary drilling and water sampling <br />events may be necessary in the future. The need for additional monitoring <br />activities and timing for these activities can only be determined as <br />additional data become available and evaluated. It is anticipated that <br />MPCA will continue to be provided with water quality data, water level <br />data, and drilling records as they become available. Furthermore, it is <br />expected that MPCA staff will be informed of activities on a periodic <br />basis and that significant changes or additions to the program will be <br />documented and provided to MPCA. <br /> <br />It is understood that the major purpose of the Remedial Investigation is <br />identification of groundwater impacts, and therefore, potential impacts to <br />off-site domestic wells. It is anticipated that additional phases of <br />monitoring work may be conducted, particulary in the area of MW-16B and <br />MW-4B. <br /> <br />Quality Assurance/Quality Control Plan Addendum <br /> <br />39. <br /> <br />An expanded QA/QC Plan will be provided by ETC in October for MPCA review. <br />The QA/QC Plan Addendum will cover provisions of 'Interim Guidelines and <br />Specifications for Preparing Quality Assurance Project Plans," <br />QAMS-O05/80, U.S. Environmental Protection Agency, December 2g, 1980, and <br />"Preparation of State Lead Remedial Investigation Quality Assurance Plans <br />for Region V," U.S. Environmental Protection Agency, April 4, 1984. <br /> <br /> <br />