Laserfiche WebLink
Ce <br /> <br />Comments: <br /> <br />Determine the impact of potential water pollution problems and <br />any subsequent need for accelerated utility installation. <br /> <br />We a~e not anticipating a significant involvement of ou~ time <br />or budget on thi~ i~em, however, if our findings indicate that <br />more effort is warra~ed we will inform the City of~-the need <br />and the anticipated cost. <br /> <br />Discussions with consu~ng engineers involved in the past <br />with the potential pollution problems at the si~e, have <br />indicated that the study to determine the extent of pollution <br />and tike timing for public systems simply cannot be done in the <br />time frame and witi~n the parameters prescribed for tl~ <br />study. <br /> <br />Budget cos~ for in~t~n~ sanitary sewer and wate~d,~Ln <br />improvements would be developed to co~ider the possible <br />financial impact of ~ervin~ any a~ea which may be determined <br />to be affected by ground ~er pollution from the existing <br />landfill. Budget costs developed would be compared to possible <br />~sable benefit received by the affected prop~i~ to <br />determine the extent of any outside funding 'necessary to have <br />sanitary sewer and watermain improvements installed. <br /> <br />Budget cost~ developed would be for improvements in~talled in <br />accordance with the City of Ramsey's Current comprehensive <br />sa~tary sewer and water system plans. <br /> <br />Graphics and text will indicate the extent of our findings. <br /> <br />Short, Elliott, Hen~LcP~on, Consulting Engineers, w~l be <br />r~ponsible for researci~ng and analyzing the poten~ <br />problem~ and u~y costs. <br /> <br /> <br />