My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/29/1985 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 10/29/1985 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:43:44 AM
Creation date
8/4/2004 10:56:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
10/29/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I~amsey Landfill Ad Hoc Committee <br />October I I, 1985 <br />Page 5 <br /> <br />Two special sections of the report shall be prepared~ one will detail the methodology <br />being utilized in arriving at the various findings together with pertinent criteria, and the <br />second shall be a summary to contain the conclusions and recommendations of the <br />consultant in respect to the findings of the study. One element of the conclusions shall <br />be a finding as to whether, if the City of Ramsey had similar commercial/industrial <br />development, would the landfill have the same effect upon market values. <br /> <br />Various maps, graphs, charts, aerial photographst and ground level photographs will be <br />prepared for inclusion in the report and to make the results of the study easily <br />communicated to interested groups. Slides will be prepared of all pertinent graDhic <br />materials. <br /> <br />CLIENT'S I~SPOI~iBILITIES <br /> <br />The Ad Hoc Committee will make themselves available to participate in the rating scale <br />procedure referenced in parts I, A and B. In addition, the client will furnish to the <br />consultant all engineering data available os to the impact of potential water pollution <br />problems and any subsequent need for accelerated utility installation. <br /> <br />TI~RMS AND CONDITIONS <br /> <br />I~. Bordner Consultants is prepared to began immediately upon receipt of authorization <br />to proceed. A preliminary draft will be prepared for review by the Landfill Ad Hoc <br />Committee by December I, 1985. It should be noted, however, that in our experience, o <br />study of this complexity will toke generally four to six weeks to complete. Therefore, <br />the completeness and finality of this draft will depend upon the dote upon which <br />authorization to proceed is received. The final draft and slides con be completed within <br />twenty days after the draft is approved. <br /> <br />I~. Bordner Consultants agrees to complete the study os described in this proposal for the <br />following fixed fees: <br /> <br />A. I Local Comparison ~5,500.00 <br />B. II Metro Area-Wide Comparison $8,500.00 <br />C. One hundred copies of the final report with slides $2~500.00 <br /> TOTAL $ I fi,500.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.