My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/12/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 11/12/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:44:21 AM
Creation date
8/4/2004 11:03:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/12/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> ! <br />I <br />I <br /> i <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />Community Ttealth & Social Services Board <br />Report to the Anoka County Board of Commissioners <br />for their meeting on August 20, 1985 <br />Page 3 <br /> <br />to limit and/or modify their request in the following manner; <br /> <br />Removal o! soils from the middle and south "Schedule <br />areas, as shown on the plan submitted with the request, <br />will be limited to only those suitable for middle horizon <br />final cover. <br /> <br />ge <br /> <br />Paragraph one, line 2, of Waste Management's August 5, <br />1985 correspondence referring to "two drawings" be <br />corrected to read "three drawings". <br /> <br />Note 16 of drawing A-2 be amended to delete the <br />reference to base line topography (a~d base He <br />lepeg~aphy ~e~ belh e( these a~eas as e~ May~ <br /> <br />References to "middle earthen cover" and to "top soil" <br />are defined as set forth in the County's Solid Waste <br />Ordinance for the "middle horizon" and "upper horizon" <br />final cover soils, respectively. <br /> <br />Soils obtained ~rom Inventory Site P can be used only for <br />daily and final cover and necessary site maintenance for <br />the currently licensed landfill operation as set ~orth in <br />the plans on file in the Environmental Services Office <br />dated August 16, 1982 and received by the County on <br />September IA, 1982. Any other use, including but not <br />limited to landfill expanston, of sorts trom Inventory 5tte~ <br />P Jsprohi]~it~d by th~ 8eVelOpment limi~pos~ed ~y.. <br />Minn; stat. '~73~g06,'~Ubd. i. <br /> <br />The "South g0 Borrow" area, phase three, will be <br />restored (top soil, seeding, and fertilizer) in the same <br />manner as phases one and two. <br /> <br />7. The quantity of final in place top soil to be replaced on <br /> excavated areas will be at least four inches. <br /> <br />No excavation will occur in the "South 80 Borrow" area <br />until Waste Management has obtained all necessary <br />permits or approvals from the City o! Ramsey. <br /> <br />No development will occur in Inventory Site P, as <br />provided by Minn. Stat. q73.806, subd. l., except as set <br />forth in the August 6, 1985 request, as modified above, <br />and previously approved Phase iV land[illing. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.