Laserfiche WebLink
Increased Productivity of Labor <br /> Business Attraction PSD Development LLC is a local developer,land <br /> The City of Ramsey has received feedback from a owner,and businesses owner. A majority of PSD <br /> number of business prospects that are hesitant to LLC's holdings are located off Ramsey Boulevard, <br /> locate in the Ramsey due to a lack of adequate just north of US 10. <br /> regional transportation infrastructure.Developers and "In 2014,Wurth Adams (a$15B global company) <br /> tenants continue to ask when an interchange will be engaged PSD,LLC to design and construct a facility <br /> constructed at Ramsey Boulevard. While the to replace their North American headquarters and <br /> Northstar Commuter Rail Station addresses some regional transportation hub in Ramsey. After many <br /> regional transportation issues,the lack of investment months of planning,design and schematics of <br /> in the US 10 corridor constrains the City's ability to business campus were developed. The project was a <br /> 220,000 sq ft building,which would have created <br /> attract new employers that provide high-paying jobs. 230jobs. After the Worth Adams'decision making <br /> Examples of projects lost since 2013 with primary team was caught in heavy traffic numerous times <br /> reason due to the lack of a grade-separated access at when visiting the Ramsey site,they realized the US <br /> Ramsey Boulevard or improvements to US 10 include: 10 corridor constrained their ability to successfully <br /> operate. Subsequently,that transaction fell <br /> Industrial Users (390 jobs),Large Retailers through." <br /> (200 jobs),Hotel/Conference Center (65 « <br /> jobs),Regional Hospital (260 jobs),Theater US Highway 10 has been a vital artery in the NW <br /> suburbs of the Twin Cities Metro Area,it may have <br /> (50 jobs), and a Fitness Facility (50 jobs). been viable many years ago,but is substantially <br /> inadequate today. Expansion and improvements of <br /> The City of Ramsey is confident that development US Highway 10 will be the single largest driving <br /> interest in the area is improving. Projects have gone force to retain residents and businesses,as well as, <br /> forward over the past year and a half that indicate revitalize this area." <br /> businesses and developers are interested in locating <br /> Matt Kuker <br /> and expanding in the Ramsey. COO,PSD Development LLC <br /> Business Retention <br /> Construction of an interchange at Ramsey Boulevard is essential to preserving existing jobs in The <br /> City of Ramsey and Anoka County. The existing at-grade, signaled,intersection at US 10 and Ramsey <br /> Boulevard,and the at-grade crossing of the BNSF Railway,are significant barriers to customers <br /> visiting Ramsey businesses,the process of shipping/ receiving freight,and employees traveling to-or- <br /> from Ramsey businesses. <br /> For example,the City of Ramsey is working with a prospect now (2016) that is contemplating an <br /> 80,000 square foot expansion to their 85,000 manufacturing facility in Ramsey. This business <br /> provides products to the food industry, space satellite manufacturers,and nuclear power plants;and <br /> not only does business in the Midwest,but globally. With the proposed expansion,this business <br /> would expect to go from 175 to 225 employees within two years. This business has indicated the <br /> current condition of US 10 is an immediate and serious concern,as it affects their ability to do <br /> business and recruit/ retain employees. <br /> Another example includes the Life Fitness/ Hammer Strength manufacturing facility in Ramsey. Life <br /> Fitness is a subsidiary of Brunswick Corporation (NYSE,BC). This Fortune 500 company is heavily <br /> invested in the State of Minnesota,with a Life Fitness plant in Ramsey,a Cybex plant in Owatonna, <br /> Lund plant in New York Mills,and Crestliner plant in Little Falls. Life Fitness recently completed a <br /> roughly 50,000 square foot expansion to their 280,000 square foot facility in Ramsey;which will <br /> move their current employment levels in Ramsey from 457 to over 500 within two years. Life Fitness <br /> has also voiced concern that the current condition of US 10 is causing problems in their ability to do <br /> business and recruit/ retain employees. <br /> US 10/CSAH 56 FASTLANE Application 16 City of Ramsey <br />