Laserfiche WebLink
will apply, including intermodal projects located at airport <br /> facilities.8 Applicants should demonstrate that a project that is <br /> required to be included in the relevant State, metropolitan, and <br /> local planning documents has been or will be included. If the <br /> project is not included in the relevant planning documents at the <br /> time the application is submitted, the applicant should submit a <br /> statement from the appropriate planning agency that actions are <br /> underway to include the project in the relevant planning document. <br /> To the extent possible, freight projects should be included in a <br /> State Freight Plan and supported by a State Freight Advisory <br /> Committee (49 U.S.C. 70201, 70202). Applicants should provide <br /> links or other documentation supporting this consideration. <br /> 'In accordance with 23 U.S.C. § 134 and§ 135,all projects requiring an action by the Federal Highway <br /> Administration(FHWA)must be in the metropolitan transportation plan,transportation improvement program(TIP) <br /> and statewide transportation improvement program(STIP).Further,in air quality non-attainment and maintenance <br /> areas,all regionally significant projects,regardless of the funding source,must be included in the conforming <br /> metropolitan transportation plan and TIP.To the extent a project is required to be on a metropolitan transportation <br /> plan,TIP,and/or STIP,it will not receive a FASTLANE grant until it is included in such plans.Projects not <br /> currently included in these plans can be amended by the State and metropolitan planning organization(MPO). <br /> Projects that are not required to be in long range transportation plans,STIPs,and TIPS will not need to be included <br /> in such plans in order to receive a FASTLANE grant. Port,freight rail,and intermodal projects are not required to <br /> be on the State Rail Plans called for in the Passenger Rail Investment and Improvement Act of 2008.However, <br /> applicants seeking funding for freight projects are encouraged to demonstrate that they have done sufficient planning <br /> to ensure that projects fit into a prioritized list of capital needs and are consistent with long-range goals.Means of <br /> demonstrating this consistency would to include the projects in TIPS or a State Freight Plan that conforms to the <br /> requirements Section 70202 of Title 49 prior to the start of construction.Port planning guidelines are available at <br /> StrongPorts.gov. <br /> 'Projects at grant obligated airports,must be compatible with the FAA-approved Airport Layout Plan(ALP),as <br /> well as aeronautical surfaces associated with the landing and takeoff of aircraft at the airport. Additionally,projects <br /> at an airport:must comply with established Sponsor Grant Assurances,including(but not limited to)requirements <br /> for non-exclusive use facilities,consultation with users,consistency with local plans including development of the <br /> area surrounding the airport,and consideration of the interest of nearby communities,among others; and must not <br /> adversely affect the continued and unhindered access of passengers to the terminal. <br /> Page 32 of 48 <br />