My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/10/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 08/10/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:29:58 PM
Creation date
8/9/2004 7:46:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/10/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Kurak inquired about the time frame of the build-out. <br /> <br />Mr. Martini replied the report does not specify a time frame; it is more or less the road map if and <br />when the City decides to do this. It does identify where some of the pressure .is now. As time <br />goes on the cost of construction will increase and the time frame should be looked at as to an <br />increase in tl~e chm'ges. <br /> <br />Councilmember Kurak stated she Would think the cost would be more modest. She would like'to <br />know more about the logic of raising that enormous rate. When more units come on line she <br />would imagine the cost would be equalized a litde better. She questioned if it is because the pipe <br />is getting bigger. <br /> <br />Assistant Public Works Director Olson explained the size needs to be extended beyond the <br />development. They have found there was not the level of detail in the 1991 comprehensive plan <br />that there was in this one, and they did not lcmow there would be the need for a lift station. This <br />is a much more accurate map than the 1991 plan. .- <br /> <br />Jon Peterson of Bolton and Menk, Inc. reviewed the following areas of the Comprehensive Water <br />System Plan: <br /> · Water Seia, ice ga'ea Demands <br /> <br /> · Summary of Existing Water System <br /> · Water Supply Projections <br /> · Water Supply Issues <br /> · Water Treatment <br /> · Water Treatment and Supply Alternatives <br /> <br />Assistant Public Works Director Olson explained the mitigation requirement for Town Center is <br />three wells. As the Council heard with the previous discussion of the water enforcernent <br />sprinkling ban, the City is getting close to needing to get the wells on line as soon as possible. <br /> <br />Councilmember Elvig inquired about the differences between ground water treatment and surface <br />water treatment. <br /> <br />Mr. Peterson reviewed the differences in the filtration systems and explained surface water <br />filtration removes biological contaminants. River bank filtration is also used by drilling into the <br />side of the riverbank and pulling the water out of the aquifer under the river.' Tkis system is not <br />as prone to floating by chemicals. <br /> <br />Assistant Public Works Director Olson indicated staffhas been planning for this, and they do not <br />want their hands to be tied in the future. The city of Andover went with the ~oundwater <br />filtration. There was discussion about the arsenic level and if the City would be required to put <br />in a treatment facility. If there is to be discussion about treatment, now is the time to get that <br />discussion started. <br /> <br />City Council Work Session/July 27, 2004 <br /> . Page 3 of 5 <br /> <br />-109- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.