My WebLink
|
Help
|
About
|
Sign Out
Home
08/10/04
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
2000's
>
2004
>
08/10/04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 3:55:14 PM
Creation date
8/9/2004 9:32:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
08/10/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY <br />2004 SCHEDULE OF RATES, FEES AND CHARGES <br /> <br /> SERVICE OR IACENSE <br /> <br />UTII,ITY RATES <br /> <br />Residential Curb-side Prugram fce/qtr <br /> <br />Lateral Ilenelit Charg. es <br /> <br />installation of Cobra strccl lisht <br />traditionairc subdivision street light (wi100 fl of wire) <br /> <br />Residential billing: <br /> urban saMivision slrcct Ill, hi rate per Iol (>7/92) <br /> rural subdivision slrcct light rate per lot <br /> lot <br /> <br />Residenlial <br /> <br /> tlivalcnt <br />e/acre COiIIlII./JBO. <br /> <br />[tlsta]latioll of meier w/rclltOte <br />;/8" Meter with horn <br /> ' I lorn <br /> <br />Oilier thall 5/8" fooler <br /> <br />[.[econnect fee/Water shut oll'al Curbstop <br /> <br />Water Use Permil <br /> <br />Colltlection chaq4e/res, eqaivalenl <br />[.ateral Bcnetit ('hal <br /> <br />SPECIAL NOTES <br /> <br />2004 Amendmenls <br /> 8/I0/04 <br /> <br /> 2004 <br />Adopted <br /> <br /> 5.64 <br /> <br /> 60.50 <br /> 60.50+2.67/1000 gal. <br /> in excess of 20,000 ~al. <br />' current construction index $1800.00 596.00 <br />· current construction index 3,204.00 <br />' current construction index 3,305.00 <br /> <br /> 700.00/light <br /> 1300.00/light <br /> 270.00/light <br /> <br /> 8.50/quarter <br /> 14.00/quarter <br /> 1.29/quart, <br /> <br /> 6.30/quarter <br />ineers Calculations $25.20/REU/qIr <br />' current construction index 375.00 <br />' current construction index 3,741.00 <br /> <br /> 1.61 <br /> 24.15 <br /> 140.00 <br /> 150.00 <br /> 45.00 <br /> Cost plus 15% <br /> 90.00 <br /> 50+$25/hr stafY time <br />~lies Meter & backflow 15.00 <br />' current construction index 1,327.00 <br />'current construction index 7,135.00 <br /> <br />' current construction index <br /> <br />7,355.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.