Laserfiche WebLink
CITY OF RAMSEY <br />2004 SCHEDULE OF RATES, FEES AND CHARGES <br /> <br /> SERVICE OR IACENSE <br /> <br />UTII,ITY RATES <br /> <br />Residential Curb-side Prugram fce/qtr <br /> <br />Lateral Ilenelit Charg. es <br /> <br />installation of Cobra strccl lisht <br />traditionairc subdivision street light (wi100 fl of wire) <br /> <br />Residential billing: <br /> urban saMivision slrcct Ill, hi rate per Iol (>7/92) <br /> rural subdivision slrcct light rate per lot <br /> lot <br /> <br />Residenlial <br /> <br /> tlivalcnt <br />e/acre COiIIlII./JBO. <br /> <br />[tlsta]latioll of meier w/rclltOte <br />;/8" Meter with horn <br /> ' I lorn <br /> <br />Oilier thall 5/8" fooler <br /> <br />[.[econnect fee/Water shut oll'al Curbstop <br /> <br />Water Use Permil <br /> <br />Colltlection chaq4e/res, eqaivalenl <br />[.ateral Bcnetit ('hal <br /> <br />SPECIAL NOTES <br /> <br />2004 Amendmenls <br /> 8/I0/04 <br /> <br /> 2004 <br />Adopted <br /> <br /> 5.64 <br /> <br /> 60.50 <br /> 60.50+2.67/1000 gal. <br /> in excess of 20,000 ~al. <br />' current construction index $1800.00 596.00 <br />· current construction index 3,204.00 <br />' current construction index 3,305.00 <br /> <br /> 700.00/light <br /> 1300.00/light <br /> 270.00/light <br /> <br /> 8.50/quarter <br /> 14.00/quarter <br /> 1.29/quart, <br /> <br /> 6.30/quarter <br />ineers Calculations $25.20/REU/qIr <br />' current construction index 375.00 <br />' current construction index 3,741.00 <br /> <br /> 1.61 <br /> 24.15 <br /> 140.00 <br /> 150.00 <br /> 45.00 <br /> Cost plus 15% <br /> 90.00 <br /> 50+$25/hr stafY time <br />~lies Meter & backflow 15.00 <br />' current construction index 1,327.00 <br />'current construction index 7,135.00 <br /> <br />' current construction index <br /> <br />7,355.00 <br /> <br /> <br />