My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/22/1979
Ramsey
>
Public
>
Agendas
>
Council
>
1979
>
Agenda - Council - 01/22/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:35:42 PM
Creation date
8/10/2004 10:54:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/22/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
consul-J-'n© en©Jneers diversi 'ed ' <br /> I I DC, <br /> p.o. box j. osseo, minnesota 55369 u (612) 425-2181 <br /> <br />civil <br />municipal <br />planning <br />environmental <br />land surveying <br />9eotechnics <br /> <br />Mr. Lloyd Schnelle <br />January 17, 1979 <br />Page Two <br /> <br />The final hearing on the 208 document will be held on January 25, 1979. Written <br />comments will be accepted until February 2, 1979. <br /> <br />It is suggested that a letter over your signature and/or the Mayor's signature <br />be forwarded to John Boland, Chairman, Metropolitan Council before February 2 <br />(and preferably before January 25) including the following request: <br /> <br />"That the language of the 208 document be revised to provide that <br /> sanitary sewer service will be made available to Ramsey upon <br /> completion of the Anoka portion of the CAB Interceptor consistent <br /> with available capacity in the Anoka Wastewater Treatment Plant." <br /> <br />This will not assure Ramsey of service availability before 1985, but it appears <br />unlikely that Anoka and Champlin will be able to utilize the excess capacity in <br />the Anoka plant between 1981 and 1985, thus any excess capacity beyond the needs <br />of Anoka and Champlin could be made available to Ramsey. Since the Anoka plant <br />is now owned by the MWCC and the Anoka portion of the CAB Interceptor will be <br />~wned by the MWCC a strong argument could be made that Anoka and Champlin do <br />not have first rights to any excess plant capacity. Anoka, however, plans to <br />finance the temporary link between the CAB Interceptor and the Anoka plant and <br />therefore would control use of that critical facility. Champlin use, however, <br />will be limited to the capacity of the existing Mississippi River crossings. <br /> <br />If you have any questions about the suggested letter, please call. <br /> <br />Very truly yours, <br /> <br />S DIVERSIFIED, INC. <br /> <br />Richard L. Sba <br />Vice President <br /> <br />RLS/jmj <br /> <br />, , .k~ith (;aswell jr. ;j darrell schneider ,, richard sha <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.