My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/1979
Ramsey
>
Public
>
Agendas
>
Council
>
1979
>
Agenda - Council - 07/23/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:38:41 PM
Creation date
8/11/2004 2:25:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: Robert Hutchison <br />From: Art Dunn <br />Subject: Anoka 'Landfill Slope of Termination <br /> <br />On Tuesday, June 19, 1979 Dave Harman and I surveyed, the slopes at <br />the Anoka Landfill to determine if the final cover application was <br />adgquate to comply with the provisions of the solid wast~ ordinance. ~ <br />The slopes probed consists of approximately the west 150 feet of the . <br />north slope and the entire west slope of the landfill. The slopes <br />were probed approximately 10 feet from the bottom of the slop~, approx- <br />imately midway between the bottom and top of the slope and approximately <br />10 feet from the top or crest of the slope. Probes were ~aken at 30 <br />foot intervals along the entire areas surveyed. <br /> Based on our findings the only area needing additional final <br />cover application was the northwest corner of the landfill along the <br />bottom edge of the area surveyed. It was also noted during o~r invest- <br />igation that there were several washouts that had occured from the recent <br />rains. These washouts must be filled with top soil prior to seeding. <br />There is also an area that has exposed lime sludge that.is located im- <br />mediately south of the area seeded last fall that must have a final cover <br />application prior to seeding operations. The attached sketch map shows <br />the areas probed and the readings of cover over lime Sludge and th~ <br />total cover applied over the solid wasts. Ail readings are in inches. <br /> <br />bb <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.