Laserfiche WebLink
Review File: Brookfield 8th Addition <br />Preliminary Plat Exhibits <br />Engineering Review <br />September 16, 2016 <br />Page 2 of 4 <br />8. This project will require a stormwater permit from the Lower Rum River Watershed <br />Management Organization (LRRWMO). The project is not impacting wetlands so a <br />wetland modification permit will not be required. The project will require approval of <br />the wetland delineation by the LRRWMO Technical Evaluation Panel and ratification by <br />the Board of Directors. <br />9. The LRRWMO requirements are presented at the end of this memo. <br />Sheet Snecific Comments: <br />Existing Conditions <br />1. A brief description of the soil types represented on the map must be added in table form. <br />Preliminary Plat <br />1. The back drainage and utility easements must be adjusted to be above the FEMA 100 <br />year elevation on all lots. <br />2. Lots 3 & 4, Block 1 and Lots 7, 8, 9, 10, 11 +and 16 do not meet the requirement for 100 <br />ft from front property line outside of drainage and utility easements. <br />Grading Drainage and Erosion Control Plan <br />1. As noted above, the FEMA 100 year flood plain elevations must be updated. <br />2. The typical lot information and the elevations on each house pad must be revised as <br />follows: <br />• The elevation at the front of the pad is the actual garage floor elevation. <br />• The Elevation of the back of the pad is the floor elevation. <br />3. Turn off the tree symbols and elevations on this sheet. <br />4. All floor elevations must be revised to be at least 3 feet above the highest anticipated <br />ground water table, 2 feet above the designated or designed 100-year flood elevation or 1 <br />foot above the nearest emergency overflow, whichever is higher. <br />5. The Lot Elevation Table must be revised. <br />6. Positive drainage must be provided across Lot 1, Block 1 from the existing lift station. <br />C 1.1 <br />1. Check clearance between water services under storm sewer and specify insulation if <br />needed. <br />2. Provide sewer and water service stubs to Lots 9 and 10, Block 1, and to Lot 1, Block 2. <br />3. A pedestrian curb ramp must be added at the trail entrance in Block 2. <br />4. Connect 8" watermain to watermain under 166th Avenue. <br />5. Connect 168th Circle to 166th Avenue. <br />6. Add note: The City of Ramsey will operate all valves after they are connected to the <br />system. Water may not be drawn from hydrants. Water for dust control is available at <br />City owned water fill stations located at 167th and Quicksilver or 14100 Jaspar Street. <br />