My WebLink
|
Help
|
About
|
Sign Out
Home
08/21/78
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1970's
>
1978
>
08/21/78
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 4:05:21 PM
Creation date
8/26/2004 7:54:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission - Special
Document Date
08/21/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
consu ting en© neer,., d vets ed nc, <br /> p.o. box j. osseo, minnesota 55369 ,zt (612) 425-2181 <br /> <br />civil <br />municipal <br />planning <br />environmental <br />land surveying <br />geotechnics <br /> <br />Mr. Lloyd Schnelle, Ctty Admtnistrator <br />Ctty of Ramsey <br />August 17, 1978 <br />Page 2 <br /> <br />2. All areas that have settled or broken up be repaired. ' ..... <br /> <br />2. A culvert be placed across the street at the low point to provide drainage <br /> parcel 670. <br /> <br />4. A '!O0-.foot di2mete'r;'.cu'l.~'de,sac -:be-.,c:onstructed on'::the:,north end-,of:.,.t,he :',:' '-%:< ~,]:~ " <br /> street in accordance with the city's current street standards with <br /> directed to the existing pond. <br /> <br />In discussing the above street dedication with the property owners representative, ~: <br />Mr. Craig )~illey, he indicated that the cul-d?sac would be constructed on the <br />HOff~n property. This would make the overall length of the street approximately <br />900 feet. Present city ordinances li~it cul-de-sacs to a maximum length of 600 <br />feet. ttowever, in reviewing the s~rrounding street patterns in the area, this <br />cul-de-sac could be eliminated by connecting Magnesium Steer to 142nd Avenue at <br />the ti~ the Hoffman property-is developed. <br /> <br />Prior to acceptance of the street by the city we would recommend that the street be <br />upgraded or the property owners· provide a performance bond and enter into a perfo~ance - <br />contract with the city to guarantee the completion of the improvements. <br /> <br />Upon completion of the work the property owners should furnish a maintenance bond for <br />a period of one year to insure that the road is upgraded satisfactorily. The property <br />owners should also pay the city for any expensesincurr~d in employing the services of <br />professional consultants in acquiring the street. <br /> <br />If you have any questions in regard to the above' please let us know. <br /> <br />Yours tr'uly, <br /> <br />CO,NSULTING ENGINEERS DIVERSIFIED, INC. <br />Peter R. Raatikka, P.E. <br /> <br />'PRR:Jah <br /> File: RT3:ll-9 <br /> <br />keith caswell jr. r] darrell schneider ,~ richard sha <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.