Laserfiche WebLink
Street Improvements <br />U <br />15-STR-007 <br />Project Name Alpine Drive Reconstruction <br />Total Cost $793,600 <br />I <br />and to Varioli <br />Reconstruction of Alpine Drive from Armstrong Bo <br />U <br />Justification <br />I <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />N <br />O <br />O <br />CO <br />C) <br />0) <br />O <br />O <br />Crt. <br />C) <br />71. <br />M <br />N <br />cc <br />rl <br />N <br />N_ <br />Funding Sources <br />Storm Water Utility Fund <br />