Laserfiche WebLink
Street Improvements <br />Street Improvement <br />1-Existing Obligation (High) <br />1 co <br />G' bA p <br />Aj <br />U U 0. <br />Q <br />15-STR-010 <br />cn <br />U <br />• <br />U) <br />1-1 <br />C <br />N <br />Project Name <br />Total Cost $353,800 <br />Description <br />C <br />0 <br />O <br />0 <br />a) <br />a) <br />uction at t <br />eluding recons <br />ularly scheduled basis, <br />ce on a re <br />C <br />a) <br />cu <br />C <br />C <br />a) <br />a) <br />a) <br />C <br />Each paved street within the City is scheduled to r <br />2017 Projects: Riversbend and Sunwood Drive between Ramsey Boulevard and Bunker Lake Boulevard. <br />There is a total of $2.2M designated to maintain streets annually. <br />whenever possible. <br />essed at 25% of c <br />C <br />C) <br />cu <br />Justification <br />rgency repai <br />0 <br />a) <br />b1 <br />0 <br />a) <br />0 <br />U <br />0 <br />a) <br />C <br />iL <br />C <br />0 <br />a) <br />a) <br />a) <br />) <br />0 <br />a) <br />onal pavement life. These streets were selected based on Paser rating and time since last pavement maintenance treatment. <br />Overlaying streets provides add <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />N <br />N <br />V�1 <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />00 <br />N <br />N <br />CO <br />U) <br />M <br />0 <br />0 <br />co <br />m <br />H <br />N <br />N <br />N <br />N <br />N <br />N <br />M <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />00 <br />N <br />N <br />Funding Sources <br />CD CD <br />U) U) <br />- CO <br />CO CD <br />N <br />CD LO io <br />LO- <br />CO CO <br />N <br />