Laserfiche WebLink
I <br />I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br /> <br />,I <br /> I <br /> I <br /> ! <br /> I <br /> i <br /> I <br /> I <br /> I <br /> I <br /> <br />170.0112G <br /> <br />- 11 - <br /> <br />3) <br /> <br />Development on more than one parcel of residential <br />property or any development of commercial or industrial <br />property. It is intended that this classification shall <br />include all proposed plats and subdivisions which create <br />two or more parcels. <br /> <br />Classification of numbers 2 and 3 in paragraph c above must <br />provide all of the information requested in paragraph b above. <br /> <br />Classification number 1 above shall provide a certificate of <br />survey to the Building Inspector at the time the building permit <br />is applied f~r. The Building Inspector shall review the lot for <br />which the building permit is requested by reviewing that data <br />submitted for the environmental permit for the plat in which the <br />lot is located. This review shall be made in order to insure that <br />the "Permit S~andards" adopted herein are complied with and that <br />the construction of-such a single family home will be consistent <br />with said "Permit Standards". <br /> <br />Expiration,' Extension and Revisions <br /> <br />a) <br /> <br />A permitee shall begin the work authorized by the permit <br />within sixty (60) days from the date of issuance of the <br />permit unless a different date for the commencement of work <br />is set forth in the permit. The-permitee shall complete the <br />work authorized by the permit within the time limit specified <br />in the permit which in no event shall exceed more than 12 <br />months from the date of issuance. The permitee shall notify <br />the Zoning Administrator at least 24 hours prior to the <br />commencement of work. <br /> <br />b) <br /> <br />c) <br /> <br />Should the work not be commenced as specified herein, then <br />the permit shall become void. However, if prior to the date <br />established for commencement of work the permitee makes <br />written request to the Zoning Administrator for an extension <br />of time to commence the work, setting forth the reaons for <br />the required extension, the Administrator.may grant one <br />extension of not greater than one s~gle'year. <br /> <br />Any revision of the originally approved ·site plan must be <br />approved by the City Council after findings by-the Planning <br />Commission and Zoning Administrator. <br /> <br />A permit may be approved subject to compliance with <br />conditions which are specifically set forth in the permit and <br />are necessary to insure compliance with the requirements <br />contained in this section. Such conditions may, among other <br />matters, limit the size, kind or character of the proposed <br />development, require the construction of other structures <br />including special foundations and soil stabilization <br />structures, establish required monitoring procedures, require <br />such alterations of the site as may be necessary, require <br /> <br /> <br />