Laserfiche WebLink
consulting engineers .... <br /> dvers ed nc, <br /> p.o. box j. osseo, minnesota 55369 L~ (612) 425-2181 <br /> <br />civil <br />municipal <br />planning <br />environmental <br />land surveying <br />geotechnics <br />The Honorable Mayor and City Council <br />City of Ramsey .. <br />February 5, 19B0 <br />Page 2 <br /> <br />In review of the on-site wastewater disposal system, the size of the <br />drainfield i§. not indicated and the system.does not meet the building <br />setback requirement of 20 feet. <br /> <br />In review of the building, the plan indicates that it is to be con- <br />structed of metal siding to match the existing building. City ordinances <br />state that any building ~n an Industrial district shall be of material <br />other than metal on at least fifty percent of the exposed wall where the~ <br />building is adjacent to any other existing or future structure or street. <br /> <br />If you have any questions in regard to this site plan, please let us know. <br /> <br />Yours truly, <br /> <br />CONSULTING ENGINEERS DIVERSIFIED, INC. <br /> <br />Peter R. Raatikka, P.E. <br /> <br />PRR/jmj <br /> <br />CC: <br /> <br />Council (5) <br />Lloyd Schnelle, City Administrator <br />Minnesota Utilities <br /> <br />File: RT2'15-75 <br /> <br />keithcaswelljr. L]darrellschneider ~richardsha <br /> <br /> <br />