My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 01/12/2017
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2017
>
Agenda - Economic Development Authority - 01/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:13:31 PM
Creation date
3/14/2017 10:57:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
01/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> SSB <br /> &&Assoc- engineering•planning•environmental•construction 701 Xenia Avenue South <br /> Suite 300 <br /> Minneapolis,MN 55416 <br /> Tel. 763-5414800 <br /> Fax: 763-541-1700 <br /> Memorandum <br /> To: Patrick Brama, City of Ramsey <br /> From: Jim Stremel,Project Manager, WSB&Associates <br /> Date: December 2, 2016 <br /> Re: Yolite Street Improvements—Feasibility& Engineer Estimate <br /> Provided below is a brief feasibility with information and assumptions used to estimate the cost of constructing <br /> Yolite Street between Veterans Drive and Sunwood Drive NW. The total cost of street, storm sewer, <br /> watermam, and sanitary sewer improvements was estimated to be$394,900. <br /> Existing Conditions <br /> There is currently no roadway that connects Veterans Drive and Sunwood Drive NW in the proposed <br /> project area and no buildings exist on the adjacent sites. At each of the adjacent roadways, there are <br /> existing entry points into the site. Based on available aerial mapping, the width was measured to be <br /> 36' face-to-face. <br /> It was assumed that storm sewer, watermain, and sanitary sewer do not exist within the proposed <br /> roadway corridor,but that stubs for these utilities are available at the entry point from Sunwood Drive <br /> NW. <br /> No subsurface soil information was available for the preparation of this report. A conservative <br /> assumption that silty/clayey sands are located onsite was used. <br /> Proposed Improvements <br /> The proposed street section for Yolite Street was assumed to be a 275-foot long, 36-foot wide (face- <br /> to-face) urban street section between Veterans Drive and Sunwood Drive NW. The proposed street <br /> section will consist of 1.5 inches of bituminous wearing course, 2 inches of bituminous base course, 8 <br /> inches of Class 5 aggregate base, and 12 inches of select granular borrow over an acceptable, <br /> compacted subgrade. It was assumed that the future site uses would not generate a significant amount <br /> of truck traffic. <br /> A geotechnical study was not provided by the City and so it was conservatively assumed that a 12 <br /> inch sand section will be added to the City standard detail for an urban street. Concrete curb and gutter <br /> will be installed on both sides of the street and will tie into the existing curb and gutter at Veterans <br /> Drive and Sunwood Drive NW at each end. A 6-foot wide 6" concrete walk is proposed on both the <br /> east and the west side of Yolite Street. <br /> Streetscape improvements, in accordance with the Ramsey COR design standards, are proposed for <br /> the 6-foot wide boulevards between the proposed curb and concrete walk. These improvements <br /> include deciduous trees, two types of lighting units, irrigation systems, and benches for pedestrians. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.