Laserfiche WebLink
Due to the short section of roadway proposed, it was assumed that the electrical and irrigation <br /> components needed for control and operation will be part of a larger system within the development <br /> and was not included with this scope of work. <br /> To serve the proposed development, sanitary sewer was assumed to be required along the majority of <br /> Yolite Street and connect to an existing sanitary stub from the main on Sunwood Drive NW. One <br /> manhole with a new casting will be installed where the new sewer dead ends. A chimney seal is <br /> proposed to prevent inflow and infiltration. Eight inch service stubs were included in each direction <br /> from the manhole(capped at end)for future property owners to connect. <br /> The proposed water main work includes looping the existing water main between Veterans Drive and <br /> Sunwood Drive NW with 8"ductile iron pipe. The proposed service to the west was assumed to be an <br /> 8-inch pipe (large lot) and the site to the east a 6-inch along with a gate valve for each service stub. A <br /> hydrant was also included along Yolite Street. <br /> Proposed storm sewer installation includes two catch basins located at a low point in the new street <br /> and reinforced concrete pipe to connect these new structures to existing storm sewer on Sunwood <br /> Drive NW. It is also suggested that perforated PVC drain tile be placed behind the curb at the new <br /> structures if a sand subbase is installed. The storm sewer pipe was sized only for runoff within the <br /> street; a larger pipe may be required to convey runoff from the adjacent sites. The estimate also did <br /> not include costs for permanent stormwater management. <br /> Cost Estimates <br /> A detailed opinion of cost for the project area can be found attached to this memorandum. The <br /> opinions of cost incorporate estimated 2017 construction costs and include a 10% construction <br /> contingency factor. Indirect costs are projected at 25% of the construction cost and include <br /> engineering,legal, financing, and administrative costs. <br /> Summary of Estimated Project Costs <br /> Total <br /> Surface Improvements $186,800 <br /> Streetscape Improvements $93,600 <br /> Sanitary Improvements $37,800 <br /> Water Main Improvements $52,000 <br /> Storm Improvements $24,700 <br /> TOTAL $394,900 <br /> It was assumed that the project as estimated will be bid and constructed as a stand-alone project. If <br /> the project is constructed in conjunction with other site improvements, costs may be less due to <br /> economy of scale. Information pertaining to project funding or construction schedules were not <br /> provided by the City. <br /> ` Page 2 <br />