Laserfiche WebLink
COST ESTIMATE <br /> wYOLITE STREET IMPROVEMENTS <br /> TOTAL CONSTRUCTION 102,124.00 <br /> Engineering, Legal, Administration 31% 31,658.44 <br /> TOTAL PROJECT COST 133,782.44 <br /> YOLITE STREET IMPROVEMENTS <br /> No. ITEM UNIT QTY PRICE EXTENSION <br /> 1 2021.501 MOBILIZATION LS 1 10,500.00 10,500.00 <br /> 4 2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT 20 6.00 120.00 <br /> 8 2104.503 REMOVE CONCRETE PAVEMENT SQ YD 20 15.00 300.00 <br /> 9 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 20 15.00 300.00 <br /> 2104.509 REMOVE POST EACH 6 70.00 420.00 <br /> 14 2104.511 SAWING CONCRETE PAVEMENT LIN FT 40 5.00 200.00 <br /> 14 2104.511 SAWING BITUMINOUS PAVEMENT LIN FT 40 4.00 160.00 <br /> 18 2105.501 COMMON EXCAVATION (P) CY 760 20.00 15,200.00 <br /> 2105.507 SUBGRADE EXCAVATION CY 0 20.00 0.00 <br /> 20 2105.522 SELECT GRANULAR BORROW CY 0 20.00 0.00 <br /> 22 2112.501 SUBGRADE PREPARATION STA 3 300.00 900.00 <br /> 2123.610 STREET SWEEPER(WITH PICKUP BROOM) HOUR 15 100.00 1,500.00 <br /> 23 2211.501 4"AGGREGATE BASE, CLASS 5 MODIFIED TON 820 16.00 13,120.00 <br /> 25 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL 60 4.00 240.00 <br /> 26 2360.501 1.5"WEARING COURSE LV4WE45030B TON 90 75.00 6,750.00 <br /> 27 2360.502 2" NON-WEARING COURSE LV3NW35030BR TON 120 75.00 9,000.00 <br /> 56 2521.501 CONCRETE SIDEWALK 4"THICK SQ FT 1,690 10.00 16,900.00 <br /> 57 2531.501 CONCRETE CURB&GUTTER DESIGN B618 LIN FT 570 14.00 7,980.00 <br /> 59 2531.507 8"CONCRETE DRIVEWAY PAVEMENT SQ YD 100 75.00 7,500.00 <br /> 60 2531.532 F&I PEDESTRIAN RAMP EACH 0.00 <br /> 61 2531.618 F&I TRUNCATED DOMES SQ FT 32 45.00 1,440.00 <br /> 63 2563.601 TRAFFIC CONTROL LS 1 2,000.00 2,000.00 <br /> 64 2564.537 INSTALL SIGN EACH 4 150.00 600.00 <br /> 67 2573.502 SILT FENCE, HEAVY DUTY LIN FT 300 3.50 1,050.00 <br /> 68 2573.530 INLET PROTECTION EACH 1 1,200.00 1,200.00 <br /> 2574.525 COMMON TOPSOIL BORROW CY 20 30.00 600.00 <br /> 69 2575.505 SODDING TYPE LAWN SOD SY 190 8.00 1,520.00 <br /> 71 2582.502 12"SOLID LINE WHITE- EPDXY LIN FT 32 7.00 224.00 <br /> 72 2582.502 4" BROKEN LINE YELLOW- EPDXY LIN FT 280 2.50 700.00 <br /> 2582.503 CROSSWALK MARKING EPDXY SQ FT 80 10.00 800.00 <br /> 73 2573.53 STORM DRAIN INLET PROTECTION EACH 6 150.00 900.00 <br /> TOTAL 102,124.00 <br /> Yolite Street Estimate.xlsx BP-2 Revised 12/21/2016 <br />