Laserfiche WebLink
o The eastbound approach should include a left turn lane, two through lanes, <br /> and one right turn lane. <br /> • Bunker Lake Boulevard (west of commercial section to Puma Street): <br /> o Expand to a three lane section for development. <br /> o Right turn lanes (locations and lengths) will be determined based on <br /> development type. Right turn lanes will typically be required where <br /> development related trips are anticipated to be more than 100 per day. <br /> • Puma Street: <br /> o Expand to a three lane section for development (two through lanes and one <br /> center left turn lane). Depending on what type of developments occur on <br /> the east side of Puma Street, and where those accesses are located, Puma <br /> Street could potentially remain as a two lane roadway. <br /> o Right turn lanes (locations and lengths) will be determined based on <br /> development type. <br /> • Bunker Lake Boulevard & Puma Street Intersection: <br /> o An all-way stop or single lane roundabout will operate adequately at this <br /> intersection for the 2040 Full-Build conditions. A southbound left turn lane <br /> and westbound right turn lane are recommended for an all way stop. <br /> c. Mid-Term Improvements <br /> • See attached Traffic Memorandum in Appendix B. <br /> d. Long-Term Improvements <br /> • See attached Traffic Memorandum in Appendix B. <br /> e. Discussion of Findings <br /> • The required improvements within the study area can be implemented based on the <br /> phasing plan described above. Each series of improvements for Bunker Lake Boulevard <br /> and Puma Street can be implemented as the properties immediately adjacent to the <br /> roadways are developed. <br /> • Puma Street could potentially be developed as a two lane section with right and left <br /> turn lanes at key access points.This will depend on access point locations, type of <br /> development on the east side of Puma Street, and location of accesses along the <br /> corridor.We recommend proceeding with the three lane section at this time due to <br /> the uncertainties of development in the area. <br /> • For Phase 1A, right turn lanes will most likely be required both eastbound and <br /> westbound along Bunker Lake Boulevard and southbound along Puma Street at <br /> proposed access locations.Temporary paving will be required to transition back to the <br /> existing Bunker Lake Boulevard and the existing Puma Street. <br /> • For Phase 113, right turn lanes will most likely be required both northbound and <br /> southbound along Puma Street at proposed development access locations.Temporary <br /> paving will be required to transition back to the existing Puma Street. <br /> • For Phase 2, right turn lanes will most likely be required both northbound and <br /> southbound along Puma Street at proposed development access locations. <br /> Prepared by:Bolton&Menk,Inc. <br /> Future Business Park—City of Ramsey Page 6 <br />