My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 03/09/2017
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2017
>
Agenda - Economic Development Authority - 03/09/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:14:17 PM
Creation date
3/14/2017 11:00:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
03/09/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• For the Future Phase, right turn lanes will most likely be required along Bunker Lake <br /> Boulevard in both the eastbound and westbound directions.Temporary paving will be <br /> required to transition back to the existing Bunker Lake Boulevard. <br /> • Our analysis indicates that, while nearing capacity, the intersection of Bunker Lake <br /> Boulevard and Armstrong Boulevard will not require improvements until the Area of <br /> Additional Consideration is developed. <br /> VII. ADDITIONAL IMPROVEMENT CONSIDERATIONS <br /> For more detailed information of each of the following items, please reference the previous study <br /> report. <br /> Street Lighting <br /> The costs included for street lighting were derived from recent projects within the City of Ramsey. <br /> Trails/Sidewalks <br /> Project costs shown in this report include trails along the south side of Bunker Lake Boulevard and <br /> the east side of Puma Street. <br /> Phase Transitions <br /> Bunker Lake Boulevard and Puma Street will be constructed to wider sections than currently exist. <br /> Because the roadways will be constructed in phases, they will need to taper to meet the existing, <br /> narrower roadway widths.These taper sections will then be removed as the next phase of <br /> improvements is completed. Costs were included in each phase for these tapering roadway <br /> sections. <br /> Right Turn Lane Additions <br /> Right turn lanes will be required at each access off of Bunker Lake Boulevard and Puma Street.The <br /> actual access locations will be dependent upon the type of land use and internal site <br /> characteristics.We included allowances for the right turn lanes in each phase for budgeting <br /> purposes. <br /> Landscaping <br /> The improvements considered with this report include a very utilitarian landscaping approach to <br /> the area. Bituminous trails and lighting were included, but other features, such as trees, shrubs, <br /> decorative features and monuments are not included in the estimated project costs. <br /> Right of Way and Easements <br /> We assumed that required rights of way would be dedicated as a portion of the development <br /> process and no costs are included in the project costs for acquisitions. <br /> Prepared by:Bolton&Menk,Inc. <br /> Future Business Park—City of Ramsey Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.