My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/08/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 04/08/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:01:49 PM
Creation date
9/3/2004 12:30:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/08/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The street sections proposed as shown on Exhibits B and C consists of a 3 inch <br />gravel base with a 1~" bituminous surface. This section is equivalent to a 5-ton <br />design in accordance to the Department of Transportation specifications. This <br />section has been previously used in the city and other communities with no detri- <br />mental effects. It is.estimated that this street section has a life expectancy <br />of 15 years with minimal maintenance. <br /> <br />The proposed construction would not include any driveway construction with the <br />exception of a one foot apron, which would be.provide~ on all driveways to protect <br />the edge of the pavement. It would be the homeowner's responsibility to extend' <br />existing bituminous or concrete driveways to match the.street. <br /> <br />Storm Drainage Improvement: ¢ <br /> <br />The present drainage system appears adequate, therefore,-only minor ditch grading <br />and cleaning of the exiSting'cross-Street culverts are proposed at this time.- <br /> <br />Some existing driveways presently'do'not have driveway culverts. While not all <br />driveways would need a driveway culvert, those lots which presently may cause <br />potential flooding problems~ should be required to install driveway culverts. <br />This work is proposed to be done by the owner of the affected property. <br /> <br />Costs: <br /> <br />Estimated costs and estimated quantities are provided below for the proposed <br />improvements. <br /> <br /> Item <br />Bituminous Surfacing <br />Class V Gravel <br />Shaping and Widening <br /> <br />'ESTIMATED'COSTS <br /> <br />Est..Quantity Est. Cost <br /> <br />700 Ton $17,150 <br />1500 Ton 8,250 <br />Lump Sum 3,500 <br /> <br />-3- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.