Review File:Brookfield 8th Addition <br /> Preliminary Plat Exhibits <br /> Engineering Review <br /> September 16, 2016 <br /> Page 3 of 4 <br /> C 1.2 <br /> 1. Provide minimum 0.1 foot drop through each storm structure. <br /> 2. Revise access drive to existing lift station. Provide minimum 16 foot wide paved access <br /> drives to both east and west sides of lift station with 10 foot clearance from infrastructure. <br /> 3. Nyloplast catch basin for lift station is not acceptable. Storm sewer structures for City <br /> facilities must be concrete. <br /> 4. The lift station detail does not provide positive drainage away from the structure. The <br /> slabs must be raised to provide positive drainage to the street or a larger easement must <br /> be provided on Lot 1, Block 1 so that drainage will flow to the north. <br /> C 2.1 <br /> 1. This sheet must be placed after sheet C2.2 in the set. <br /> 2. This sheet is missing key components required by the MPCA Construction Stormwater <br /> Permit. Review the permit and add the required elements. <br /> 3. Add a note to the inspection section: "Daily (after rain) and weekly inspection logs must <br /> be emailed to the City. The complete logs must be submitted to the City prior to <br /> finalizing the project. The City must grant approval for submittal of the Notice of <br /> Termination for the project." <br /> C 2.2 <br /> 1. This sheet must be placed before sheet C2.1 in the set. <br /> 2. Columns for quantities and unit of measurement must be added to the table. <br /> 3. The MPCA will be assigning a TMDL for dissolved oxygen to Trott Brook. Information <br /> in the SWPPP will need to be revised to reflect this change. <br /> Detail Sheets <br /> 1. Add typical section for 1681h Circle with dimensions, grades, and pavement section. <br /> 2. Remove detail STO-10. It is for larger pipe than is used on this project. <br /> 3. Remove Nyoplast 30" drain basin detail (see note for sheet C 12). <br /> 4. Add the MnDOT 5 sheet detail set for Pedestrian Ramps. A ramp will be required where <br /> the trail meets the street. <br /> Stormwater Calculations <br /> A stormwater summary report was provided. The elevations on the grading plan do not <br /> match the Hydrocad Model. <br /> Drainage area 3 empties into an existing wetland that was modeled with the previous phase <br /> of Brookfield. The model must be updated to reflect the runoff from the back of the houses. <br /> The LRRWMO requires volume reduction (infiltration) on all projects. The benefit from the <br /> off-line filtration system is not called out in the report. The City uses the Walker spreadsheet <br /> to check for water quality treatment volume. Our analysis is not complete at this time. We <br /> will provide the results of our analysis when it is complete. <br />