Laserfiche WebLink
Review File:Brookfield 8th Addition <br /> Preliminary Plat Exhibits <br /> Engineering Review <br /> September 16, 2016 <br /> Page 4 of 4 <br /> Pipe sizing calculations for the 10-year storm must be provided with the final plat. <br /> A project manual which includes the bid form, contract and specifications must be submitted <br /> with the final plat. <br />