Laserfiche WebLink
-2- <br /> <br />4) The preparation of the Alternative Site Study Report (_25 copies) <br /> to present and summarize the findings and recommendations, <br /> <br />Before conducting the aerial and topographic survey, a preliminary <br />airport layout plan would be~prepared to ensure that the'required <br />facilities can be reasonably accommodated on the proposed alternative <br />site. <br /> <br />The total estimated cost of the Alternative Airport Site Study is <br />$6,500.00 with the topographic and aerial survey costs estimated at <br />$4,000.00 and the preparation of the schematic airport layout plan, <br />the conceptual land use plan, and the study report estimated at <br />$2,500.00. <br /> <br />At this time the City is requesting grant funding to cove~ at least <br />80% of the total cost. <br /> <br />Please advise the City of any other necessary documents we need to <br />provide for State or Federal funds to proceed with this project. <br /> <br />If you have any further questions, please contac{ Mr. Lloyd G. Schnelle, <br />City Administrator, City of Ramsey or Mr. Peter Raatikka, City Engineer <br />Consulting Engineers Diversified at 425-2181. <br /> <br />Sincerely, <br /> <br />CITY OF RAMSEY <br /> <br />~o~ <br /> <br />TGG: sb <br /> <br />cc: Mr. Dean Larson, Minnesota Department of Transportation <br /> Mr. Peter Raatikka, Consulting Engineers Diversified <br /> <br /> <br />