My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/05/2017
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 01/05/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:27:11 AM
Creation date
3/14/2017 12:27:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/05/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY LAND USE APPLICATION <br /> TECHNICAL REVIEW FILE <br /> DATE DECEMBER PROJECT ADDRESS WEST OF GERMANIUM <br /> 22,2016 STREET NORTH OF 170TH <br /> LANE NW <br /> PROJECT.TITLE BROOKVIEw ESTATES <br /> ESCROW# <br /> DEPARTMENT: Engineering <br /> Name: Leonard Linton <br /> TECHNICAL Phone: 763 433-9834 <br /> Email: llinton@ci.ramsey.mn.us <br /> REVIEWER: <br /> The Engineering Department offers the following comments regarding the Sketch Plan for <br /> Brookview Estates. The submittal consists of 1 sheet prepared by LHB. The plan is not dated. <br /> General comments: <br /> 1. Verify the name of the Plat. There are not previous additions of Brookfield Meadows in <br /> Ramsey. <br /> 2. A legend is not shown. All symbols used on each sheet must be added to the legend for <br /> the sheet. <br /> 3. Ramsey City Details will be required in the Preliminary and Final Plat Documents. <br /> 4. Class 5 shall meet the Ramsey modified gradation. This gradation must be included in <br /> the details. <br /> 5. The 100 year flood elevation for Trott Brook must be shown. Please reference the Flood <br /> Insurance Study Effective December 15, 2015. <br /> 6. This project will require a stormwater permit from the Lower Rum River Watershed <br /> Management Organization (LRRWMO). <br /> 7. The LRRWMO requirements are presented at the end of this memo. <br /> 8. Drainage and utility easements are required over the ponding areas. The easement must <br /> include the 100 year high water elevation and also cover a minimum 15 ft wide access <br /> route from ROW to the pond for access purposes. <br /> 9. A SWPPP will be required for this project. Add a note to the inspection section: "Daily <br /> (after rain) and weekly inspection logs must be emailed to the City. The complete logs <br /> must be submitted to the City prior to finalizing the project. The City must grant <br /> approval for submittal of the Notice of Termination for the project." <br /> 10. The MPCA will be assigning a TMDL for dissolved oxygen to Trott Brook. Information <br /> in the SWPPP will need to be revised to reflect this change. <br />
The URL can be used to link to this page
Your browser does not support the video tag.