My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/02/2017
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 02/02/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:27:24 AM
Creation date
3/14/2017 1:32:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/02/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/22/16 REVISOR CKM/IL AR4240 <br />11.1 Subp. 67. Setback. "Setback" means a separation distance measured horizontally. <br />11.2 Subp. 68. Shore impact zone. "Shore impact zone" means land located between <br />11.3 the ordinary high water level of public waters and a line parallel to it at a setback of 50 <br />11.4 percent of the required structure setback or, for areas in agricultural use, 50 feet landward <br />11.5 of the ordinary high water level in areas of agricultural use. See Figure 2. <br />Figure 2: Shore Impact Zone <br />OHWL <br />Structure <br />Setback <br />Shore Impact <br />Zone <br />(50% structure <br />setback) <br />Ordinary <br />High Water <br />Level <br />(OHWL) <br />11.6 Subp. 69. Shoreline facilities. "Shoreline facilities" means facilities that require <br />11.7 a location adjoining public waters for ingress and egress, loading and unloading, and <br />6106.0050 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.