NPDES PERMIT AND SWPPP COMPONENTS <br />DESCRIPTION OF CONSTRUCTION ACTIVITY <br />EROSION PREVENTION AND SEDIMENT CONTROL <br />INSPECTIONS AND MAINTENANCE <br />DEVELOPER <br />NATIONAL SELF -STORAGE, LLC <br />I. THE CURRENT MN NPDES PERMIT DATED AUGUST I, 2013 IS REFERENCED IN THIS <br />DOCUMENT AS THE PERMIT. <br />THE SWPPP NCLUDES THE FOLLOWNG COMPONENTS: <br />• CONSTRUCTION DOCUMENTS PREPARED BY LANDFORM <br />• STORMWATER MANAGEMENT PLAN/NARRATIVE <br />• MAINTENANCE PLAN FOR PERMANENT STORMWATER BMPS <br />SITE EVALUATION/ASSESSMENT/PLANNING <br />CONTACT INFORMATION/RESPONSIBLE PARTIES <br />THE OPERATOR SHALL HAVE PRIMARY RESPONSIBILITY AND SIGNIFICANT AUTHORITY FOR <br />THE DEVELOPMENT, IMPLEMENTATION, MAINTENANCE, INSPECTION AND AMENDMENTS TO THE <br />APPROVED SWPPP. DUTIES INCLUDE BUT ARE NOT LIMITED TO: <br />• ENSURING FULL COMPLIANCE WITH THE SWPPP AND THE PERMIT <br />• IMPLEMENTING ALL ELEMENTS OF THE SWPPP, INCLUDING BUT NOT LIMITED TO: <br />•• IMPLEMENTING PROMPT AND EFFECTIVE EROSION AND SEDIMENT CONTROL <br />MEASURES <br />IMPLEMENTING ALL NON -STORM WATER MANAGEMENT, AND GOOD HOUSEKEEPING <br />BMPS ENSURING THAT NO MATERIALS OTHER THAN STORM WATER ARE <br />DISCHARGED IN QUANTITIES, WHICH WILL HAVE AN ADVERSE EFFECT ON <br />RECEIVING WATERS OR STORM DRAIN SYSTEMS, ETC. <br />• CONDUCTING ROUTINE INSPECTIONS AND MAINTENANCE <br />• ENSURING ELIMINATION OF ALL UNAUTHORIZED DISCHARGES <br />• COORDINATING TO ASSURE ALL OF THE NECESSARY CORRECTIONS/REPAIRS ARE <br />MADE IMMEDIATELY, AND THAT THE PROJECT COMPLIES WITH THE SWPPP, THE <br />PERMIT, AND APPROVED PLANS AT ALL TIMES. <br />•• <br />STORMWATER POLLUTION PREVENTION MANAGEMENT MEASURES <br />OWNER/OPERATOR MUST DEVELOP POLLUTION PREVENTION MANAGEMENT MEASURES, <br />IMPLEMENT GOOD HOUSEKEEPING BMPS, MUST FOLLOW ALL APPLICABLE FEDERAL, STATE, <br />AND LOCAL BUILDING CODES, OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA), AND THE <br />GENERAL CONDITIONS AND GENERAL REQUIREMENTS OF THE CONSTRUCTION CONTRACT. <br />2. THE OPERATOR SHALL MINIMIZE THE EXPOSURE TO STORMWATER OF ANY OF THE <br />PRODUCTS, MATERIAL, OR WASTES STORED ON SITE. <br />3. BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS MUST BE UNDER <br />COVER. <br />4. CHEMICALS AND LANDSCAPE MATERIALS SHALL BE UNDER COVER TO PREVENT THE <br />DISCHARGE OF POLLUTANTS. <br />5. OPERATOR TO TRACK PROGRESS OF THE FOLLOWING ITEMS ON SITE MAPS: <br />• PORTABLE TOILETS <br />• MATERIAL STORAGE AREAS <br />• VEHICLE AND EQUIPMENT FUELING AND MAINTENANCE AREAS <br />• CONCRETE WASHOUTS <br />• PAINT AND STUCCO WASHOUTS <br />• DUMPSTERS OR OTHER TRASH AND DEBRIS CONTAINERS <br />• SPILL KITS <br />• STOCKPILES <br />• ANY OTHER NON-STRUCTURAL NON -STORM WATER MANAGEMENT BMPS <br />• ANY TEMPORARILY REMOVED STRUCTURAL BMPS <br />• ANY CHANGES TO THE STRUCTURAL BMPS <br />6. SOLID WASTE: COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS, FLOATING <br />DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION AND DEMOLITION DEBRIS AND OTHER <br />WASTES MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL <br />REQUIREMENTS. <br />7. HAZARDOUS WASTE: OIL, GASOLINE, PAINT AND ANY HAZARDOUS SUBSTANCES MUST BE <br />PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS OR <br />OTHER DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO <br />PREVENT VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS WASTE OR MATERIALS <br />MUST BE IN COMPLIANCE WITH MINN. R. CH. 7045 INCLUDING SECONDARY CONTAINMENT <br />AS APPLICABLE. <br />8. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE <br />TIPPED OR KNOCKED OVER. <br />g. CONCRETE AND OTHER WASHOUT WASTE: OPERATOR MUST PROVIDE EFFECTIVE <br />CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT <br />OPERATIONS. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND <br />THE CONTAINMENT MUST BE DESIGNED SO THAT IT DOES NOT RESULT IN RUNOFF FROM <br />THE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED <br />OF PROPERLY AND IN COMPLIANCE WITH MPCA RULES. A SIGN MUST BE INSTALLED <br />ADJACENT TO EACH WASHOUT FACILITY THAT REQUIRES SITE PERSONNEL TO UTILIZE THE <br />PROPER FACILITIES FOR DISPOSAL OF CONCRETE AND OTHER WASHOUT WASTES. <br />10. EXTERNAL VEHICLE WASHING: EXTERNAL WASHING OF TRUCKS AND OTHER <br />CONSTRUCTION VEHICLES MUST BE LIMITED TO A DEFINED AREA OF THE SITE. RUNOFF <br />MUST BE CONTAINED AND WASTE PROPERLY DISPOSED OF. NO ENGINE DEGREASING IS <br />ALLOWED ON SITE. <br />SWPPP CONTACT AND TRAINING INFORMATION <br />I. OWNER: <br />NATIONAL SELF STORAGE <br />ATTN: TROY HALVERSON <br />2827 107TH AVENUE <br />BLAINE, MN 55449 <br />763-898-7212 <br />T.HALVER2@AOL.COM <br />2. OPERATOR: <br />TO BE DETERMINED. CONTACT OWNER UNTIL CONTRACTOR IS SELECTED. <br />3. LONG TERM MAINTENANCE AND OPERATION: <br />NATIONAL SELF STORAGE <br />TROY HALVERSON <br />2827 107TH AVENUE <br />BLAINE, MN 55449 <br />763-898-7212 <br />T.HALVER2@AOL.COM <br />4. SWPPP DESIGNER: <br />RANDY HEDLUND, P.E. <br />LANDFORM PROFESSIONAL SERVICES <br />105 SOUTH FIFTH AVENUE, SUITE 513 <br />MINNEAPOLIS, MN 55401 <br />612-252-9070 <br />RHEDLUND@LANDFORM.NET <br />CERTIFICATION: U OF MN, DESIGN OF CONSTRUCTION SWPPP, EXP. MAY 31, 201C1 <br />5. SWPPP INSPECTOR/MANAGER: <br />FRED VOLZ, LANDFORM PROFESSIONAL SERVICES <br />105 SOUTH FIFTH AVENUE, SUITE 513 <br />MINNEAPOLIS, MN 55401 <br />612-252-9070 <br />FVOLZ@LANDFORM.NET <br />CERTIFICATION: U OF MN, DESIGN OF CONSTRUCTION SWPPP, EXP. 2018 <br />6. BMP INSTALLATION AND REPAIR: <br />TO BE DETERMINED. CONTACT OWNER UNTIL BMP INSTALLER AND MAINTAINER IS <br />SELECTED. <br />CERTIFICATION: , EXP. <br />I. CONSTRUCTION ACTIVITY INCLUDES EORSION AND SEDIMENT CONTROL BMPS INSTALLATION, <br />CLEARING AND GRUBBING, SITE GRADING, UTILITY INSTALLATION, BUILDING CONSTRUCTION, <br />PAVING, AND LANDSCAPING. <br />SCHEDULE OF BMP INSTALLATION AND CONSTRUCTION ACTIVITY <br />INSTALL PERIMETER SEDIMENT CONTROL BMPS PRIOR TO START OF OTHER SITE WORK. <br />REFER TO GRADING, DRAINAGE, PAVING AND EROSION CONTROL SHEET(S) FOR INITIAL <br />LOCATIONS OF BMPS. <br />2, CONSTRUCT PERMANENT SEDIMENTATION BASINS PRIOR TO UPLAND DISTURBANCE. <br />INSTALL PERIMETER SEDIMENT CONTROL BMPS AROUND NORMAL WATER LEVEL. <br />3, STABILIZE OUTLETS FROM PERMANENT SEDIMENTATION BASINS. <br />4, PERFORM WORK IN PHASES TO MINIMIZE DISTURBED AREA AT ANY ONE TIME. <br />5, STRIP TOPSOIL FROM AREAS TO BE DISTURBED AND STOCKPILE WITH PERIMETER <br />SEDIMENT CONTROL BMPS. PROVIDE STABILIZATION IF LEFT LONGER THAN 14 DAYS. <br />6, ROUGH GRADE SITE. <br />7, INSTALL UTILITIES. <br />8, FINAL GRADE PAVEMENT AREAS AND COMPACT SUBGRADE. <br />q, LAY DOWN PAVEMENT AGGREGATE AND COMPACT. <br />10, INSTALL CURB AND GUTTER. BACKFILL AFTER A MINIMUM OF THREE DAYS. <br />11, CONSTRUCT BUILDING/ADDITION AND SITE FEATURES. <br />12, CONSTRUCT SITE WALKS AND PATIOS. <br />13, PROVIDE FINAL STABILIZATION. <br />14. CONNECT NURP POND TO STORM SEWER INLETS. <br />15. REMOVE TEMPORARY BMPS. <br />WATERS WITHIN ONE MILE OF SITE <br />IMPAIRED WATERS - REQUIRED TMDLS <br />I. THERE ARE NO IMPARTED WATERS WITHIN I MILE OF THE SITE <br />TEMPORARY SEDIMENTATION BASIN(S) <br />I. THIS PROJECT DOES NOT HAVE MORE THAN 10 ACRES DRAINING TO A COMMON <br />LOCATION AND THEREFORE A TEMPORARY SEDIMENT BASIN IS NOT REQUIRED. <br />2. TEMPORARY SEDIMENT BASINS SHALL PROVIDE TREATMENT TO RUNOFF BEFORE IT <br />LEAVES THE CONSTRUCTION SITE OR ENTERS SURFACE WATERS. THE CONTRACTOR <br />SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS: <br />A. SEDIMENTATION BASINS MUST PROVIDE LIVE STORAGE OF RUNOFF RESULTING FROM <br />THE 2-YR 24-HR RAINFALL EVENT FROM EACH ACRE DRAINED TO THE BASIN WITH <br />A MINIMUM OF 1,800 CF/ACRE LIVE STORAGE VOLUME. (WHERE NO CALCULATION <br />HAS BEEN PERFORMED, EACH BASIN SHALL PROVIDE AT LEAST 3,600 CF/ACRE OF <br />LIVE STORAGE.) SEDIMENTATION BASINS MUST INCLUDE A STABILIZED EMERGENCY <br />OVERFLOW TO PREVENT BASIN INTEGRITY FAILURE. <br />B. DISCHARGE FROM TEMPORARY SEDIMENTATION BASINS WILL BE WITHDRAWN FROM <br />THE SURFACE IN ORDER TO MINIMIZE THE DISCHARGE OF POLLUTANTS. <br />3. DISCHARGE FROM BASIN DRAINING SHALL NOT ADVERSELY AFFECT THE RECEIVING WATER <br />OR DOWNSTREAM PROPERTIES. CONTRACTOR WILL VISUALLY CHECK TO ENSURE <br />ADEQUATE TREATMENT HAS BEEN OBTAINED AND THAT NUISANCE CONDITIONS WILL NOT <br />RESULT FROM THE DISCHARGE. <br />4. ANY DISCHARGE OBSERVED TO BE OCCURRING DURING THE INSPECTION SHALL BE <br />RECORDED, DESCRIBED, AND PHOTOGRAPHED. <br />SEE GRADING, DRAINAGE, PAVING AND EROSION CONTROL SHEETS FOR THE LOCATION <br />AND TYPE OF TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL BMPS. SEE <br />GRADING AND DRAINAGE, UTILITY, PLANTING, AND LANDSCAPE SHEETS FOR THE LOCATION <br />AND TYPE OF PERMANENT EROSION PREVENTION AND SEDIMENT CONTROL BMPS. <br />2. MINIMIZE DISTURBED AREAS AND PROTECT NATURAL FEATURES AND SOIL <br />APPROPRIATE CONSTRUCTION PRACTICES (E.G. CONSTRUCTION PHASING, VEGETATIVE <br />BUFFER STRIPS, HORIZONTAL SLOPE GRADING) SHALL BE USED TO MINIMIZE EROSION. <br />AREAS NOT TO BE DISTURBED WILL BE DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, <br />SILT FENCE ETC.) BEFORE WORK BEGINS. <br />OPERATOR SHALL DEVELOP METHODS TO MINIMIZE SOIL COMPACTION OUTSIDE OF BUILDING <br />PADS, PAVEMENT AREAS AND UTILITY TRENCHES AND SHALL USE TRACKED EQUIPMENT <br />WHEREVER PRACTICABLE. <br />TOPSOIL SHALL BE SALVAGED AND REUSED TO THE EXTENT PRACTICABLE. <br />3. PHASE CONSTRUCTION ACTIVITY <br />SEDIMENT CONTROL PRACTICES SHALL BE ESTABLISHED ON ALL DOWN GRADIENT <br />PERIMETERS BEFORE ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE <br />PRACTICES SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED IN <br />ACCORDANCE WITH THE PERMIT. <br />THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED <br />TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR <br />PASSAGE OF VEHICLES. ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS QUICKLY <br />AS POSSIBLE AND THE SEDIMENT CONTROL PRACTICES SHALL BE INSTALLED IMMEDIATELY <br />AFTER THE ACTIVITY IS COMPLETED. HOWEVER, SEDIMENT CONTROL PRACTICES SHALL <br />BE INSTALLED BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE ACTIVITY IS NOT <br />COMPLETE. <br />4. CONTROL STORM WATER FLOWING ONTO AND THROUGH THE PROJECT <br />THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH <br />OR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, OR <br />DIVERTS WATER AROUND THE SITE, SHALL BE STABILIZED WITHIN 200 LINEAL FEET FROM <br />THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE INTO ANY SURFACE WATER. <br />STABILIZATION OF THE LAST 200 LINEAL FEET SHALL BE COMPLETED WITHIN 24 HOURS <br />AFTER CONNECTING TO A SURFACE WATER. <br />STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR PERMANENT DITCHES <br />OR SWALES SHALL BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING TO A SURFACE <br />WATER AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR <br />PERMANENTLY CEASED. <br />TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT <br />CONTAINMENT SYSTEM (WITH PROPERLY DESIGNED POCK DITCH CHECKS, BIO ROLLS, SILT <br />DIKES ETC.) DO NOT NEED TO BE STABILIZED. THESE AREAS SHALL BE STABILIZED <br />WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM. <br />5. STABILIZE SOILS <br />6. <br />7. <br />8. <br />g. <br />10. <br />ALL EXPOSED SOIL AREAS (INCLUDING STOCKPILES) MUST BE STABILIZED IMMEDIATELY TO <br />LIMIT SOIL EROSION WHEN THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE <br />HAS TEMPORARILY OR PERMANENTLY CEASED AND WILL NOT RESUME FOR 7 CALENDAR <br />DAYS. TEMPORARY STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC <br />COMPONENTS (E.C., CLEAN AGGREGATE STOCKPILES, DEMOLITION CONCRETE STOCKPILES, <br />SAND STOCKPILES) AND THE CONSTRUCTED BASE COMPONENTS OF ROADS, PARKING <br />LOTS AND SIMILAR SURFACES ARE EXEMPT FROM THIS REQUIREMENT. <br />TEMPORARY SOIL STOCKPILES SHALL HAVE SILT FENCE OP OTHER EFFECTIVE SEDIMENT <br />CONTROLS, AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORM WATER <br />CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES <br />UNLESS THERE IS A BYPASS IN PLACE FOR THE STORM WATER. <br />WHEN THE SITE HAS A DISCHARGE POINT WITHIN ONE MILE OF, AND FLOWS TO, A <br />SPECIAL OR IMPAIRED WATERS, ALL EXPOSED SOIL AREAS SHALL BE STABILIZED <br />IMMEDIATELY TO LIMIT SOIL EROSION IN THAT PORTION OF THE SITE WHERE <br />CONSTRUCTION HAS TEMPORARILY OR PERMANENTLY CEASED. <br />PROTECT SLOPES <br />OPERATOR SHALL AVOID WORK ON SLOPES WITH A GRADE OF 3:1 OR GREATER WHEN <br />PRACTICABLE. GRADING ON SLOPES WITH A GRADE OF 3:1 OR STEEPER WILL REQUIRE <br />TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICES DESIGNED FOR STEEP <br />SLOPES (E.C., SLOPE DRAINING AND TERRACING). <br />PROTECT STORM DRAIN INLETS <br />ALL STORM DRAIN INLETS SHALL BE PROTECTED BY APPROPRIATE BMPS DURING <br />CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET <br />HAVE BEEN STABILIZED. INLET PROTECTION MAY BE TEMPORARILY REMOVED IF A <br />SPECIFIC SAFETY CONCERN HAS BEEN IDENTIFIED. <br />ESTABLISH PERIMETER CONTROLS AND SEDIMENT BARRIERS <br />RETAIN SEDIMENT ON -SITE AND CONTROL DEWATERNG PRACTICES <br />DEWATERING OR BASIN DRAINING OF TURBID OR SEDIMENT LADEN WATER RELATED TO <br />CONSTRUCTION ACTIVITIES SHALL BE DISCHARGED TO A TEMPORARY OR PERMANENT <br />SEDIMENTATION BASIN OR TREATED WITH THE APPROPRIATE BMP PRIOR TO ENTERING THE <br />SURFACE WATER. <br />DISCHARGE SHALL NOT CAUSE NUISANCE CONDITIONS, EROSION IN RECEIVING CHANNELS, <br />ADVERSELY AFFECT RECEIVING WATER OR IMPACT WETLANDS, OR DOWNSTREAM <br />PROPERTIES. DISCHARGE POINTS SHALL BE ADEQUATELY PROTECTED FROM EROSION <br />AND SCOUR BY ACCEPTED ENERGY DISSIPATION MEASURES. <br />DISCHARGE WATER CONTAINING OIL OR GREASE SHALL BE TREATED TO REMOVE OIL OR <br />GREASE PRIOR TO DISCHARGE TO SURFACE WATERS. <br />REFER TO PERMIT REQUIREMENTS FOR TEMPORARY OR PERMANENT SEDIMENT BASINS. <br />ESTABLISH STABILIZED CONSTRUCTION EXITS <br />VEHICLE TRACKING PADS SHALL BE ESTABLISHED AS SHOWN ON THE GRADING, DRAINAGE, <br />PAVING AND EROSION CONTROL SHEET TO MINIMIZE TRACKING OF SEDIMENT FROM THE <br />CONSTRUCTION SITE ONTO ADJACENT STREETS. <br />POST CONSTRUCTION BMPS <br />SEE GRADING AND DRAINAGE, UTILITY, AND LANDSCAPE SHEETS FOR POST <br />CONSTRUCTION BMPS. <br />I. INSPECTIONS OF THE CONSTRUCTION SITE SHALL BE CONDUCTED ONCE EVERY SEVEN <br />(7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL <br />EVENT GREATER THAN 0.5 INCHES IN 24 HOURS, AND WITHIN SEVEN (7) DAYS AFTER <br />THAT. REFER TO THE PERMIT FOR INSPECTION AND MAINTENANCE REQUIREMENTS. <br />2. INSPECTIONS SHALL INCLUDE STABILIZED AREAS, EROSION PREVENTION AND SEDIMENT <br />CONTROL BMPS, AND INFILTRATION AREAS. <br />3. BMP MAINTENANCE: <br />• FOLLOW THE DESIGNER'S OR MANUFACTURER'S RECOMMENDED MAINTENANCE <br />PROCEDURES FOR ALL BMPS. <br />• REMOVE SEDIMENT FROM BMPS WHEN THE DEPTH OF SEDIMENT HAS REACHED 1/2 <br />THE HEIGHT OF THE BMP AND PROPERLY DISPOSE OF SEDIMENT INTO CONTROLLED <br />AREAS TO PREVENT SOIL FROM RETURNING TO THE BMP DURING SUBSEQUENT RAIN <br />EVENTS. <br />• REMOVE SEDIMENT FROM PAVED ROADWAYS AND FROM AROUND BMPS PROTECTING <br />STORM DRAIN INLETS. <br />• ENSURE THAT CONSTRUCTION SUPPORT ACTIVITIES, INCLUDING BORROW AREAS, <br />WASTE AREAS, CONTRACTOR WORK AREAS, AND MATERIAL STORAGE AREAS AND <br />DEDICATED CONCRETE AND ASPHALT BATCH PLANTS ARE CLEANED AND <br />MAINTAINED. <br />• REPLACE DAMAGED BMPS THAT NO LONGER OPERATE EFFECTIVELY. <br />RECORDKEEPING/RECORD RETENTION <br />THE SWPPP (ORIGINAL OR COPIES) INCLUDING, ALL CHANGES TO IT, AND INSPECTIONS <br />AND MAINTENANCE RECORDS SHALL BE KEPT AT THE SITE DURING CONSTRUCTION BY <br />THE OWNER/OPERATOR WHO HAS OPERATIONAL CONTROL OF THAT PORTION OF THE <br />SITE. THE SWPPP CAN BE KEPT IN EITHER THE FIELD OFFICE OR IN AN ON SITE VEHICLE <br />DURING NORMAL WORKING HOURS. <br />2. ALL OWNER(S) MUST KEEP THE SWPPP, ALONG WITH THE FOLLOWING ADDITIONAL <br />RECORDS, ON FILE FOR THREE (3) YEARS AFTER SUBMITTAL OF THE NOTICE OF <br />TERMINATION (NOT). THIS DOES NOT INCLUDE ANY RECORDS AFTER SUBMITTAL OF THE <br />NOT. <br />3. THE FOLLOWING IS A UST OF RECORDS THAT SHALL BE KEPT AT THE PROJECT SITE <br />AVAILABLE FOR INSPECTORS TO REVIEW: <br />• COPY OF THE SWPPP, WITH ANY MODIFICATIONS <br />• INSPECTION AND MAINTENANCE RECORDS <br />• PERMANENT OPERATION AND MAINTENANCE AGREEMENTS <br />• CALCULATIONS FOR THE DESIGN OF TEMPORARY AND PERMANENT STORM WATER <br />MANAGEMENT SYSTEMS <br />• ANY OTHER PERMITS REQUIRED FOR THE PROJECT <br />• RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION <br />• ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN <br />IMPLEMENTED, INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER <br />BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE; AND <br />• ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT <br />STORM WATER MANAGEMENT SYSTEMS. <br />LOG OF CHANGES TO THE SWPPP/AMENDMENTS <br />THE OWNER/OPERATOR(S) MUST AMEND THE SWPPP AS NECESSARY TO INCLUDE <br />ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS, DESIGNED TO <br />CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS AS DETAILED IN THE PERMIT. <br />FINAL STABILIZATION <br />THE OWNER/OPERATOR(S) MUST ENSURE FINAL STABILIZATION OF THE SITE. FINAL <br />STABILIZATION AS DEFINED IN THE PERMIT. <br />TERMINATION OF COVERAGE <br />OWNER/OPERATOR(S) WISHING TO TERMINATE COVERAGE UNDER THIS PERMIT MUST <br />SUBMIT A NOTICE OF TERMNATION (NOT) TO THE MPCA. COMPLIANCE WITH THIS PERMIT <br />IS REQUIRED UNTL A NOT IS SUBMITTED. REFER TO THE PERMIT FOR DETAILS. <br />2827 107TH AVENUE <br />BLAINE, MN 55449 <br />MUNICIPALITY <br />PROJECT <br />REGENCY <br />COMMONS <br />RAMSEY, MN <br />SHEET INDEX <br />SHEET <br />TITLE <br />CO.1 CIVIL TITLE SHEET <br />C1.1 EXISTING CONDITIONS & DEMO <br />C2.1 SITE PLAN <br />C3.1 GRADING, DRAINAGE,& EROSION CONTROL <br />PAVING PLAN & NOTES <br />C3.2 SWPPP NOTES <br />C4.I UTILITIES <br />C7.1 CIVIL CONSTRUCTION DETAILS <br />C7.2 CIVIL CONSTRUCTION DETAILS <br />C7.3 CIVIL CONSTRUCTION DETAILS <br />C7.4 CIVIL CONSTRUCTION DETAILS <br />C7.5 CIVIL CONSTRUCTION DETAILS <br />L1.1 TREE PRESERVATION PLAN <br />L1.2 TREE PRESERVATION TABLE <br />L2.1 LANDSCAPE PLAN <br />L7.1 LANDSCAPE DETAILS <br />ISSUE / REVISION HISTORY <br />CONTACT ENGINEER FOR ANY PRIOR HISTORY <br />DATE <br />ISSUE 1 REVISION <br />REVIEW <br />03 JAN 2017 SITE PLAN SUBMITTAL <br />XXX <br />PROJECT MANAGER REVIEW <br />BY XX <br />DATE XX.XX.XXXX <br />CERTIFICATION <br />I hereby certify that this plan ma: 1114, or under my direct <br />supervision, and that I am a rofessional Engineer under <br />the laws of the state of <br />Qfilt OS * <br />1 /13�� <br />uction of original. Wet signed copy of <br />fessional Services, I_LC office and 15 <br />Randall C. Hedlund <br />License No: 19576 <br />Signature shown is <br />this plan on file <br />available upon r <br />IF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT <br />VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED <br />READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT <br />THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. <br />SITE PLAN SUBMITTAL <br />01-03-2017 <br />• • <br />• • <br />From Site to Finish <br />105 South Fifth Avenue <br />Suite 513 <br />Minneapolis, MN 55401 <br />FORM <br />Tel: 612-252-9070 <br />Fax: 612-252-9077 <br />Web: landform.net <br />FILE NAME <br />C302NSS001.DWG <br />PROJECT NO. <br />NSS16001 <br />® LANDFORM 2017 <br />SWPPP <br />C3.2 <br />SHEET NO. 6/15 <br />Landform®and Site to Finish ®are registered service marks of Landform Professional Services, LLC. <br />