My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. EXISTING CONDITIONS <br /> 3.1 Existing Pavement and Soil Conditions <br /> The segment of Alpine Drive between Armstrong Boulevard and Variolite Street was <br /> constructed in 2001 using bituminous pavement and B618 concrete curb and gutter. The street <br /> was constructed to a width of 32 feet from face-of-curb to face-of-curb in locations where <br /> parking is restricted, and to 38 feet from face-of-curb to face-of-curb in locations where parking <br /> is allowed along one side. The street is centered within an 80 foot right-of-way, and striping is <br /> used to delineate the parking lanes. The existing posted speed is 45 mph along the entire <br /> segment of Alpine Drive. <br /> The only pavement maintenance treatment that has been applied to this segment of Alpine Drive <br /> is spot spray patching on an as-needed basis. In 2016, Staff observed a Pavement and Surface <br /> Evaluation Rating (PASER) of 3. <br /> In 2011, MnDOT recorded a traffic volume of 1,100 average annual daily traffic (AADT)_ While <br /> truck counts are not available, Staff believes it is reasonable to assume less than 5 percent of <br /> vehicles using this street segment can be classified as truck traffic, and that the percentage of <br /> trucks using this corridor will not substantially increase over time. <br /> Northern Technologies, Inc. (NTI) was employed to complete a Geotechnical Exploration and <br /> Engineering Review for this project, which included thirteen (13) soil borings that were spaced <br /> at approximately 200 feet along Alpine Drive. The locations of the borings are shown in the <br /> Boring Location Diagram in Appendix C of NTI's report, attached in Appendix C. <br /> The soil borings provide information on existing bituminous pavement and aggregate base <br /> course thicknesses, subsurface soil conditions, existing ground water elevations, and potential <br /> issues that may be encountered during construction. Recommendations are also provided for <br /> excavations, site preparation, engineered fill and compaction, depths of unsuitable soils to be <br /> removed, ground water management, and pavement design parameters. All borings terminated <br /> at a nominal depth of 11 feet below the existing ground surface. <br /> Groundwater was observed in two soil borings at depths ranging between 10 and 10.5 feet below <br /> the existing ground surface. Based on the work being proposed and the recorded water level <br /> depths, groundwater is not anticipated to be a significant issue for work completed with this <br /> proposed project. <br /> The soil borings generally indicate that existing bituminous pavement thicknesses range between <br /> 3.5 to 5.0 inches. Apparent aggregate base was observed in five boring locations. Previously <br /> placed fill soils, generally consisting of poorly graded sand with silt and poorly graded sand with <br /> silt and gravel (SP-SM),poorly graded sand with clay (SP-SC), and clayey sand (SC) are present <br /> at depths ranging from 3.0 to 9.5 feet below the top of the pavement. Native alluvial soils <br /> consisting of poorly graded sand(SP) and poorly graded sand with silt(SP-SM)generally extend <br /> to the bottom of the borings. <br /> 3.2 Watermain <br /> Feasibility Report <br /> Alpine Drive Reconstruction <br /> City of Ramsey Project No.I7-0I Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.