My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Watermain does not exist on site. <br /> 3.3 Sanitary Sewer <br /> Sanitary sewer does not exist on site. <br /> 3.4 Storm Sewer/Drainage <br /> Storm sewer exists along the entire segment of Alpine Drive. Based on design calculations <br /> completed by City staff, minor modifications are required to the existing storm sewer system to <br /> meet current State Aid standards. This will require the addition of three catch basins and <br /> approximately 100 feet of storm sewer pipe. Stormwater runoff is currently conveyed within the <br /> concrete curb and gutter along the outside edges of Alpine Drive, where it is then collected in <br /> concrete catch basins and routed through concrete storm sewer pipes to existing wetlands, <br /> stormwater drainage ditches, and ponding facilities. <br /> 3.5 Streets <br /> 3.5.1 Existing Typical Sections <br /> Alpine Drive is centered within 80 feet of City-owned right-of-way. The street section <br /> varies between 32 feet in locations where parking is restricted, and 38 feet in locations <br /> where parking is allowed. <br /> All curb along these streets are B618 concrete curb and gutter. Parking lanes are <br /> delineated with striping. <br /> 3.5.2 Maintenance History <br /> This segment of Alpine Drive was originally constructed in 2001 and has not received <br /> proactive pavement maintenance other than spot patching on an as-needed basis. <br /> 3.6 Land Use <br /> Developed properties abutting this segment are zoned residential. <br /> Feasibility Report <br /> Alpine Drive Reconstruction <br /> City of Ramsey Project No.I7-0I Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.