|
Project Name Department Project# Priority Project Cost
<br /> 2019 Chev Caprice to Replac 2014 Chev Caprice#341 Eqpt Replacement POL-341 3 31,000
<br /> 2019 Chev Caprice to Replac 2014 Chev Caprice#342 Eqpt Replacement POL-342 3 31,000
<br /> 2019 Chev Tahoe to Replace Chev Tahoe#343 Eqpt Replacement POL-343 3 36,000
<br /> 2019 Chev Impala to Replace 2007 Lincoln#376 Eqpt Replacement POL-376 3 29,000
<br /> Replace Mobile Air Compressor Eqpt Replacement PW-016 3 65,000
<br /> Replace Engr Veh#402 With 2017 GMC Sierra Eqpt Replacement PW-402 3 35,000
<br /> Replace 2001 Case Backhoe: Unit#634 Eqpt Replacement PW-634 3 78,000
<br /> Replace 2007 3/4 Ton Pick-Up: Unit#667 Eqpt Replacement PW-667 3 43,000
<br /> Replace 2008 Bobcat Skidster: Unit#671 Eqpt Replacement PW-671 3 48,000
<br /> Replace 2014 Ex Mark Mower: Unit#683 Eqpt Replacement PW-691 3 12,600
<br /> Replace 2014 Ex Mark Mower: Unit#684 Eqpt Replacement PW-692 3 12,600
<br /> Replace 2014 Ex Mark Mower: Unit#685 Eqpt Replacement PW-693 3 12,600
<br /> Stormwater Drainage Improvements Stormwater Utility 12-STRM-001 3 350,000
<br /> Sunwood Drive Roundabout Landscaping Street Improvements 15-STR-0033 20,000
<br /> Reconstruction of Streets-Ford Brook Estates Street Improvements 15-STR-0063 780,400
<br /> 2019 Overlay Projects Street Improvements 15-STR-012 3 612,200
<br /> Total for:Priority 3 2,388,400
<br /> Priority 4-New Addition(Med)
<br /> New Electric Utility Vehicle Eqpt Replacement PW-702 4 35,000
<br /> Total for:Priority 4 35,000
<br /> Priority 5-Opportunity Unfunded/Placeholder
<br /> Ramsey Blvd RR Underpass Street Improvements 16-STR-0025 0
<br /> North Hwy 10 Frontage Road-Ramsey to SLB Street Improvements 16-STR-0035 7,000,000
<br /> Total for:Priority 5 7,000,000
<br /> Total for 2019 9,423,400
<br /> 2020
<br /> Priority 2-New Addition(High)
<br /> Sprin kler System @ Fire Station#1 Municipal Buildings 10-BLDG-004 2 25,000
<br /> Total for:Priority 2 25,000
<br /> Priority 3-Existing Obligation(Med)
<br /> Discovery Recovery Server Eqpt Replacement 15-IT--002 3 11,000
<br /> Replace Engine 11(556) Eqpt Replacement FIRE-503 3 275,000
<br /> 2020 Ford Explorer Replace 2005 F150#359 Eqpt Replacement POL-359 3 37,000
<br /> 2020 Chev Caprice -Replace2017 Chev Caprice#371 Eqpt Replacement POL-371 3 32,000
<br /> 2020 Chev Tahoe Replace 2016 Chev Tahoe#361 Eqpt Replacement POL-372 3 37,000
<br /> Replace Engr Car#407 With Chevy Impala Eqpt Replacement PW-407 3 28,000
<br /> Replace 2006 3/4 Ton Truck 2x4 Unit#654 Eqpt Replacement PW-654 3 22,000
<br /> Replace Sidewalk Machine: Unit#655 Eqpt Replacement PW-655 3 128,000
<br /> Replace 2007 International Water Truck: Unit#669 Eqpt Replacement PW-669 3 130,000
<br /> Replace 2013 Toro Wide Area Mower: Unit#679 Eqpt Replacement PW-697 3 95,000
<br /> COR Bunker Lake Blvd(Armstrong to Ramsey Blvd) Stormwater Utility 04-STRM-011 3 530,000
<br /> COR Bunker Lake Blvd(Armstrong to Ramsey Blvd) Street Improvements 04-STR-014 3 3,650,000
<br /> Reconstruction of Streets-Barthels Rum River Acres Street Improvements 17-STR-001 3 3,553,400
<br /> 2020 Overlay Projects Street Improvements 17-STR-002 3 539,000
<br /> The COR Bunker Lake Blvd(Armstrong-Ramsey Blvd) Water Utility 04-WTR-009 3 340,000
<br /> Total for:Priority 3 9,407,400
<br /> Priority 4-New Addition(Med)
<br /> New 1-Ton Pickup With Box&Plow Equipment Eqpt Replacement PW-703 4 50,000
<br /> Ford Brook Park Playground Equipment Park Improvements 04-PARK-006 4 70,000
<br /> 17
<br />
|