My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name Department Project# Priority Project Cost <br /> Fire Station 1 Sanitary Sewer Service Sewer Utility 12-SEW-002 4 60,000 <br /> Watermain Sunfish Lk Blvd Water Utility 12-WTR-001 4 450,000 <br /> Total for:Priority 4 630,000 <br /> Priority 5—Opportuni4/Unfunded/Placeholder <br /> Observation deck on the Mississippi E of Dolomite Park Improvements 06-PARK-015 5 85,000 <br /> Trail Connections Park Improvements 06-PARK-019 5 200,000 <br /> McKinley Trail Connection to Anoka Park Improvements 12-PARK-008 5 50,000 <br /> Abandon Liftstation Wildlife Sanctuary Sewer Utility 04-SEW-001 5 352,000 <br /> Abandon Lift Station River Pines Sewer Utility 08-SEW-004 5 45,000 <br /> North Hwy 10 Frontage Road-Ramsey to SLB Street Improvements 16-STR-0035 5,900,000 <br /> South Hwy 10 Frontage Rd-SLB to Anoka Street Improvements 16-STR-0045 2,000,000 <br /> River Pines Lift Station Water Connection Water Utility 08-WTR-003 5 20,000 <br /> Fire Station#1 Extension of Water Water Utility 11-WTR-003 5 55,000 <br /> Construct Well and Pumphouse#9 Water Utility 16-WTR-002 5 75,000 <br /> Total for:Priority 5 8,782,000 <br /> Total for 2020 18,844,400 <br /> 2021 <br /> Priority 3-Existing Obligation(Med) <br /> Police Copier-File Room Eqpt Replacement 17-IT-004 3 14,000 <br /> Police Copier-Patrol Eqpt Replacement 17-IT-005 3 10,000 <br /> Utility Server Eqpt Replacement 17-IT-006 3 8,000 <br /> Weblink Server Replacement Eqpt Replacement 17-IT-007 3 8,000 <br /> Replace Engine 11(556) Eqpt Replacement FIRE-503 3 275,000 <br /> 2021 Chev Impala Replace 2013 Chev Malibu#334 Eqpt Replacement POL-334 3 32,000 <br /> 2021 Ford Explorer Replace 2016 Ford Explorer#351 Eqpt Replacement POL-335 3 38,000 <br /> 2021 Ford Explorer Replace 2018 Chev Caprice#3XX Eqpt Replacement POL-366 3 38,000 <br /> 2021 Chev Tahoe Replace 2018 Chev Tahoe#3XX Eqpt Replacement POL-367 3 38,000 <br /> Replace 1991 Chipper: Unit#619 Eqpt Replacement PW-619 3 22,000 <br /> Replace 2001 John Deere Mower: Unit#635 Eqpt Replacement PW-635 3 25,000 <br /> Replace 2006 Tandem Axle Plow Truck: Unit#662 Eqpt Replacement PW-662 3 230,000 <br /> Zeolite Roadway Improvements Street Improvements 04-STR-012 3 400,000 <br /> Reconstruction of Streets: Riverdale Drive Street Improvements 17-STR-003 3 3,445,000 <br /> 2021 Overlay Projects Street Improvements 17-STR-004 3 347,000 <br /> Total for:Priority 3 4,930,000 <br /> Priority 5—Opportunity/Unfunded/Placeholder <br /> Bunker Lake Blvd Sunwood Drive Signal Street Improvements 12-STR-001 5 350,000 <br /> South Hwy 10 Frontage Rd-SLB to Anoka Street Improvements 16-STR-0045 700,000 <br /> Total for:Priority 5 1,050,000 <br /> Total for 2021 5,980,000 <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.