My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A total of 9 parcels have been identified as receiving special benefit from the improvements. <br /> These parcels are identified in the preliminary assessment map and roll in Appendix C. <br /> Staff recommends the use of special assessments to pay for 25% of all eligible improvement <br /> costs,which will then be applied across 9 assessable properties using the"area"method of <br /> assessment. All costs for this project are eligible for special assessments since all construction <br /> costs are based strictly on reconstructing the street at its existing width using a comparable <br /> pavement section design with no subgrade corrections or public utility improvements. The <br /> existing street width and pavement section are sufficient to accommodate current State Aid <br /> design standards. <br /> Staff recommends ordering a special benefit consultation report for this project to verify that the <br /> proposed assessment amount will not exceed the amount of benefit to any of the properties. If <br /> the report concludes that the benefit to any of the properties is less than the proposed preliminary <br /> assessment rate, Staff will propose to lower the assessment rate accordingly at the Assessment <br /> Hearing scheduled for October 10th, 2017. However,if the special benefit consultation report <br /> verifies that the assessment rates as proposed are justified, Staff will propose to adopt the final <br /> assessment roll using the rate as preliminarily proposed. <br /> This improvement project,which is listed in the City's current Capital Improvement Program, is <br /> proposed to be funded using a combination of special assessments to benefiting properties, street <br /> reconstruction bond proceeds, and stormwater utility funds. <br /> This project can best be constructed as a stand-alone project, is necessary, feasible, and cost- <br /> effective from an engineering standpoint, and can be constructed as proposed herein. <br /> Feasibility Report <br /> Sunwood Drive Reconstruction <br /> City of Ramsey Project No.I7-00 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.