Laserfiche WebLink
2. INTRODUCTION <br /> 2.1 Authorization <br /> The preparation of this report was authorized by the Ramsey City Council on August 9, 2016. <br /> This project has been designated as City Improvement Project No. 17-00. <br /> 2.2 Program Overview <br /> In support of the City's long-term Street Maintenance Program,the entire existing bituminous <br /> pavement section will be reconstructed using a stabilized full-depth reclamation (SFDR)process. <br /> All damaged concrete curb and gutter sections will also be removed and replaced,plus other <br /> appurtenant work will be completed as outlined in this report. <br /> The City's pavement evaluation process involves a visual evaluation of each street's pavement <br /> surface based on the type, extent and severity of each pavement distress observed. Numerous <br /> types of pavement distresses may exist within a pavement section including, but not limited to, <br /> alligator cracking, block cracking, longitudinal cracking, transverse cracking, rutting, raveling, <br /> shoving, potholes and patches. This field data is then used to rate the pavement condition. <br /> The City uses the Pavement and Surface Evaluation Rating (PASER) system to rate pavement <br /> condition. A PASER rating is a numerical index between 1 and 10 indicating the condition of a <br /> pavement based on the various pavement distresses recorded during visual observations. A <br /> PASER rating of 10 represents brand new pavement, while a PASER rating of 1 represents a <br /> pavement section that has fallen into complete disrepair requiring full reconstruction. <br /> In the fall of 2016, City staff evaluated and rated the condition of the pavement along this <br /> segment of Sunwood Drive. A PASER rating of 4 was determined for the segment of Sunwood <br /> Drive between Bunker Lake Boulevard and Ramsey Boulevard. <br /> 2.3 Scope <br /> City of Ramsey Improvement Project 17-00 proposes to reconstruct the existing bituminous <br /> pavement, to remove and replace damaged concrete curb and gutter sections, and to complete <br /> other appurtenant work on Sunwood Drive between Ramsey Boulevard/CSAH 56 and Bunker <br /> Lake Boulevard/CSAH 116 which totals approximately 3,050 linear feet(0.58 miles) in length. <br /> The existing bituminous pavement section is proposed to be reconstructed using the SFDR <br /> process. This involves milling the top 3 inches of existing bituminous pavement, reclaiming the <br /> remaining bituminous pavement along with approximately 2 inches of existing aggregate base, <br /> injecting an asphalt emulsion stabilizer into the reclaimed material, mixing and spreading the <br /> stabilized reclaimed material on top of the reshaped and compacted subgrade, then placing 4 <br /> inches of new bituminous pavement on top. This results in a 10-ton pavement design that meets <br /> current State Aid standards. <br /> A map showing the location and scope of the proposed improvements is included as Figure I in <br /> Appendix A. <br /> Feasibility Report <br /> Sunwood Drive Reconstruction <br /> City of Ramsey Project No.I7-00 Page 3 <br />