My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 05/13/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:02:26 PM
Creation date
9/7/2004 10:04:06 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The prop6sed construction would not include any driveway construction with the <br />exception of a one foot apron, which would be provided on all driveways to pro- <br />tect the edge of the pavement. It would be the'homeowner's-Pesponsibility to <br />extend existing bituminous or concrete driveways to match the street. <br /> <br />Storm Drainage Improvement: <br /> <br />With the proposed suburban street section, the need for roadside ditches is. <br />eliminated. The only drainage improvements proposed at this time are a cUlvert <br />at the intersection of County Road No. 56 and 158th Lane and a spillway on the <br />west end of 159th Lane. The proposed street grades would el.imitate street <br />drainage from ponding at the intersection of 159th Lane and Kamacite Street;' <br />however, they would not provide an. Joutlet for the existing ponding area. <br /> <br />Costs: <br /> <br />Estimated costs and estimated quantities are'provid6d :below for the proposed <br /> <br />1 mprov emen t s: <br /> <br /> Item <br /> <br />Bituminous Surfacing <br />Class V Gravel <br />Grading and Widening <br /> <br />Restoration and Drainage <br />Facilities <br /> <br />ESTIMATED COSTS <br /> <br />Est, Quanti'ty <br /> <br />Est. Cost <br /> <br />620 Ton - $15,200 <br />lO00'Ton 5,500 <br />Lump Sum 4,500 <br />Lump Sum 6,300 <br /> <br />Estimated Construction Cost <br /> <br />Contingencies, Engineering & Administrative <br />ESTIMATED PROJECT COST <br /> <br />$31,500 <br /> 7,875 <br /> <br />$39,375 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.