My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 07/13/2000
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2000
>
Agenda - Parks and Recreation Commission - 07/13/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 10:00:21 AM
Creation date
3/21/2017 2:10:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
07/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVIEW COUNTY ROAD #116 TRAIL CONSTRUCTION <br /> By: Mark Boos, Parks/Utilities Supervisor <br /> <br />CASE # <br /> <br />Background: <br /> <br />As part of Mallard Ponds town home project, the Developer is required to construct a 8' bituminous trail <br />south along Dysprosium Street NW then easterly to the plats limits. This approximate 1,117' segment <br />will be credited against the $28,200 in trail fees due. As the attached portion of the development <br />agreement indicates, the developer is also cooperating in continuing this trail construction further to the <br />intersection of T.H. 47. <br /> <br />Observations: <br /> <br />The above project may be entirely funded by Mallard Ponds trail fees. A proposed summary work plan <br />and budget for an extended project is below; <br /> <br />I I <br /> 40"~ LaneNWsouth alongDysprosiumStreetNWto CountyRoad#116then eastto theplatlimits <br /> (This segment will occur as part of the Mallard Ponds subdivision) <br /> I <br /> <br />Ae <br /> <br />· Obtain permits from Anoka County for trail construction <br /> within R.O.W <br />· All grading, sub-cutting/excavation and seeding/restoration <br /> by developer as part of concurrent activity within project. <br />· Reimbursement of approximately 1,117' of trail construction <br /> at $9.50 a lineal foot <br /> TOTAL <br /> <br /> $0.00 <br /> <br /> $0.00 <br /> <br /> $10,611.50 <br />$10,611.50 est. <br /> <br />East edge of Mallard Ponds to the intersection of T.H. 47 and County Road #116 <br /> <br />Be <br /> <br />· Sub-cutting/excavation and final grading by City Staff <br /> <br />· Seed, bale checks, and other erosion control <br />· Remove two (2) B 6/12 concrete curb sections and replace with <br /> concrete ped ramps <br /> Relocate three (3) to six (6) trees with spade <br />· Relocate guy wires <br />· Relocate Super America's irrigation (if needed) <br />· Pave approximately 1,042' of trail at $9.50 a lineal foot <br /> <br />TOTAL <br /> <br /> $0.00 <br />$1,500.00 <br />$2,000.00 <br /> <br />$450.00 <br />$0.00 <br />$0.00 <br />$9,899.00 <br />$13,849.00 est. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.