Laserfiche WebLink
EXCLUSIONS <br /> • Public, agency, focus group, or stakeholder meetings beyond those described above are <br /> excluded. <br /> • If other public meetings or other types of stakeholder engagement is required, LHB will work with <br /> you to determine a fee before beginning this work to provide a more accurate estimate, based on <br /> the type of meeting and level of staff involvement anticipated. <br /> • This estimate is based on the schedule provided by Bruce on 2/1/2017 and showing completion <br /> in November 2017. Schedule extensions of more than two months on a project of this length <br /> often result in increased coordination, rounds of review or revision, and other meetings. <br /> Therefore, if the schedule stretches beyond that timeframe, LHB will work with you to determine <br /> a fee before extending work to provide a more accurate estimate, based on the type additional <br /> work required. <br />