My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/28/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 03/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:21 PM
Creation date
3/27/2017 3:52:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/28/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation Plan Component <br /> of City of Ramsey Comprehensive Plan <br /> Introduction <br /> WSB &Associates staff will prepare a Transportation Plan for the City of Ramsey consistent with <br /> Metropolitan Council "Local Planning Handbook" requirements. The Transportation Plan will build upon <br /> elements of the existing City of Ramsey Transportation Plan. Existing transportation plan content will be <br /> utilized as much as possible, with outdated information updated to bring plan content into compliance <br /> with current Met Council requirements. <br /> Overall Transportation Plan Approach <br /> Specific tasks assumed in development of the Transportation Plan are follows: <br /> • Task 1: Project Management: WSB staff will conduct quality control and quality assurance <br /> checks on all transportation plan materials that are prepared to ensure that they meet the <br /> requirements of Met Council. <br /> • Task 2: Agency Involvement: WSB staff will participate in one work session with the City of <br /> Ramsey Public Works Committee, the MnDOT Area Manager and Anoka County transportation <br /> planning staff to discuss existing and forecasted conditions, issues identification and <br /> transportation plan goals and objectives. Up to six meetings are scheduled in total with City <br /> staff, council,various committees, the general public and adjacent communities, as needed. <br /> • Task 3: Traffic Analysis Zones (TAZs) and Travel Forecasting: WSB staff run the Met Council <br /> 2040 travel demand model to identify forecasted 2040 traffic for Principal Arterials and A-Minor <br /> Arterials. Population, employment and household data from an approved forecasted land use <br /> plan will be summarized by TAZ and broken down into 2010-2020, 2020-2030, and 2030-2040 <br /> growth periods. <br /> • Task 4: Roadway Component: WSB staff will prepare a Roadway component of the overall <br /> Transportation Plan. Maps and supporting narrative will be prepared consistent with Met <br /> Council requirements documenting the existing and proposed roadway network, associated <br /> AADTs, functional classification, etc. WSB will also collect Met Council required heavy <br /> commercial AADTs on City of Ramsey Principal Arterial and A-Minor Arterial roadways. Previous <br /> and current transportation studies in the Ramsey and adjacent communities will be documented <br /> and integrated into the roadway component, as appropriate. Access Management will be also <br /> be discussed and best practices referenced. <br /> • Task 5: Transit Component: WSB staff will prepare a Transit component of the overall <br /> Transportation Plan. The Transit component will include discussion of existing transit service <br /> and associated infrastructure. Existing and forecasted gaps in transit service will also be <br /> discussed. <br /> • Task 6: Bicycling and Walking Component: WSB staff will prepare a Bicycling and Walking <br /> component of the overall Transportation Plan. The Bicycling and Walking component will <br />
The URL can be used to link to this page
Your browser does not support the video tag.