Laserfiche WebLink
include existing/future local on-road, off-road bicycle facilities, including Regional <br /> Transportation Bicycle Network(RTBN) facilities and pedestrian facility needs. <br /> • Task 7: Aviation Component: WSB staff will prepare an Aviation component of the overall <br /> Transportation Plan. The Aviation component will include minimal language regarding existing <br /> policies that protect regional airspace since no aviation facilities are in the area of influence of <br /> the City of Ramsey. A map will also be created to illustrate existing radio beacons and other <br /> navigational aids with narrative discussing how they will be protected. <br /> • Task 8: Freight Component: WSB staff will prepare a Freight component of the overall <br /> Transportation Plan. The Freight component will include supporting narrative identifying <br /> existing freight generators, freight related facilities, existing Principal Arterial and A-Minor <br /> Arterial HCAADT, existing weight restricted roadways, insufficient clearances, at-grade railroad <br /> crossings,turning radii problems, etc. <br /> • Task 9: Final Report: WSB staff will prepare a final report of the overall Transportation Plan, <br /> including narrative and associated tables, maps and other exhibits from the individual <br /> Transportation Plan modal components. The Transportation Plan report will include summary <br /> findings and recommendations from the modal components and specific strategies in the form <br /> of general policies, projects, studies or other initiatives to address overarching transportation <br /> plan goals, objectives, existing/forecasted conditions and associated issues. Recommended <br /> projects or unresolved issues will be identified on a map for quick reference with a description <br /> of the issue or needed improvement and necessary coordination required with other agencies. <br /> • Optional Tasks: As an optional task, WSB staff will conduct an analysis of high auto crash <br /> concentrations to assist with identification of potential future safety projects. <br />