My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/14/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 10/14/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:06:42 PM
Creation date
9/10/2004 12:42:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/14/1980
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
should be monitored at least once a week until a degree a stability is evi- <br />dent. The monitoring frequency can then be adjusted to lon§er periods of <br />time, dependent on weather, surface conditions, system operations, etc. <br /> <br /> Instrumentation- We recommend that you obtain the following gas moni- <br />toring equipment and instrumentation and assign at least one individual to <br />become thoroughly familiar with their operation, calibration, and maintenance: <br /> <br />0 <br /> <br />Gas analyzer with automatic gas pump, scales - 0-5% com- <br />bustibles, 0-]00% combustibles, 0-25% oxygen--a water <br />trap and cotton absorbent pad should always be in line <br />between the instrument' and gas source. A J.W. Model HPK <br />or similar unit is recommended. (The ability to measure <br />oxygen is not mandatory, but may be helpful in deter- <br />mining the location of pipeline breaks.) <br /> <br />Magnehelic pressure gauges with ranges of 0-0.5, 0-5, <br />and 0-30 inches of H20 are recommended to determine gas <br />pipe line pressure and velocity head. <br /> <br />Pitot tube to use in conjunction with pressure gauge for <br />gas fl ow measurements. <br /> <br /> System Modification - An easterly extension of the north leg should be <br />added to the system to control the apparent landfill gas migration immediately <br />north of the landfill. Additional system capacity will be required in the <br />amount of 35 to 50 cfm per added well. A schematic control system design for <br />the extension is attached and shows some alternative locations for-placing <br />motor blowers. The increased capacity will be provided by a new motor-blower <br />unit. The existing motor-blower unit could continue to serve for the present <br />control system or be used as stand-by equipment: . With appropriate intercon- <br />nections, either motor blower could feasibly act as a backup system for the <br />other unit or during periods of maintenance. The specific system design and <br />potential for interconnec'tion will be determined during the design phase. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.