Laserfiche WebLink
EXHIBIT B <br /> <br />RAMocY TOWN CENTER: Town Center.Park West preliminary cast estimate revised 7/28/04 <br /> <br />SITE. : Qty. Uni~ Unit Price Estimate Totbl <br />Erosion Control Total: $ 8,050.00 <br />Civil Utilities Total: $ 25,000.00 <br /> <br />Slormwater Components $ 300,000.00 <br /> ;phffer boxe-', ¢ondufl, ',preoder: <br /> <br />Earthwork and Pond Liner Total: $ 640,080.00 <br /> <br />moss grading, fimsh grading, notion sod~;, dewolermg, lapsed, etc. <br />HD£ pond liner, bc~llen.t rr.,.p-rap <br /> <br />Lurge bc, ulder pond edge <br /> <br />Bituminous <br /> <br />200 EA <br /> <br />200.00 <br /> <br />Total: <br /> <br />300,000.00 <br />300,000.00 <br />40,000.00 <br /> <br />$ 77,000.00 <br /> <br />park tratl~ and ~,olkwoy; <br /> <br />troll Prlpmg - 4" ~'~cJe Jar tm,~ed ~se lrrjil <br /> <br />Concrete <br /> <br />74,000.00 <br /> 3,000.00 <br /> <br />Total: $ 469,000.00 <br /> <br />promenade. ~'~ east end near ~r Comnlon$ <br /> <br />bulkhead wail / pond hard edge (overage 6' heighl) <br /> <br />concrete pods (3',~7 ) · bench <br /> <br />concrete pad'; (7'x9) - p~cmc table <br /> <br />Architecture and Amenities <br /> <br />'45,000.00 <br />400,000.00 <br />10,000.00 <br />6,000.00 <br />8,000.00 <br /> <br />Total: $ 280000.00 <br /> <br />park povdloa <br /> <br />,c.,ede.~tr~on bc~d~e <br /> <br />Lighting and Site Electrical <br /> <br />2 EA <br /> <br />2 EA <br /> <br /> 200,000.00 <br />30,000.00 60,000.00 <br /> I0,000.00 <br />5,000.00 10,000.00 <br /> <br /> Total: $ I 96,000.00 <br /> <br />pole light= along Mall, peder, lrlr.m br~dge~ <br /> <br />pole I ghl~ (~ prom~rlode., ~oohng, fixture, wlrmng <br /> <br />Sile furnishings <br /> <br />19 <br /> <br /> 5 <br /> <br />EA <br /> <br />EA <br /> <br /> 100,000.00 <br />4,000.00 76,000.00 <br />4,000,00 20,000.00 <br /> <br />Total: $ 96,700.00 <br /> <br />benches, park: ArcoIrJ . poly silo, backed 4- arms <br /> <br />~Jr~aklrtg ~ountom <br />gr.,ties <br /> <br />b~ke ¢orkmg Ioop~ <br /> <br />Railings, Fencing, and Metalwork <br /> <br />3 4 EA <br />1 2 EA <br /> <br />4 EA <br />I 0 [A <br /> <br />2,000.00 68,000.00 <br />1,000.00 12,000.00 <br />950.00 9,500.00 <br />5,000.00 5,000.00 <br />300.00 1,200.00 <br />I00.00 i,O00.O0 <br /> <br />Total: $ 56,200.00 <br /> <br /> guardrad /handrad (¢~ ,~)m~d woll <br />Irrigation <br /> <br />Total: $ <br /> <br /> 56,200.00 <br /> <br />75,000.00 <br /> <br />N~iscellaneous Landscap~~. Improvements <br /> <br />Total: $. 16.3.,813.00 <br /> <br />· 1.00 <br /> <br /> 4.2) <br /> <br />.4C <br /> <br />AC <br /> <br />7,000.00 7,000,00 <br />· ~,250.D0 ) ~, ~ 13.00 <br /> i 38,500.00 <br /> <br />TOTAL <br /> <br />_,., 8o,, 60.00 <br /> <br />-351- <br /> <br /> <br />