My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/13/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 09/13/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:30:58 PM
Creation date
9/10/2004 3:01:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/13/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
# i.5 <br /> <br />RECEIVE BIDS AND AWARD coNTRACT FOR IMPROVEMENT PROJECT #04-31, <br /> CONSTRUCTION OF WATERMAIN ASSOCIATED WITH MUNICIPAL WELL #6 <br /> By: Brian E. Olson, Assistant Public Works Director / Principal City Engineer · <br /> <br />Background: <br /> <br />hnprovement Project #04-31 consists of the construction of 639 feet of watermain to connect <br />municipal Well #6 to Pumphouse #3 and modification of the Pumphouse associated with this <br />well. Authorization to advertise for bids was ordered on August 10, 2004, and bids were opened <br />on Tuesday, September 7, 2004. <br /> <br />Two (2) bids were received and ranged from $85,942.50 - $101,285.00. A summary of the <br />bidding is as follows: <br /> <br />Bidder <br />W.B. Miller, Inc <br />Dave Perkins Contracting, Inc. <br /> <br />Amount ofBid <br />$85,942.50 <br />$101,285.00 <br /> <br />Engineers Estimate: <br /> <br />.$185,000 <br /> <br />As part of the Master Development Agreement for the Ramsey Town Center, Well No.6 is one <br />of the three wells that were necessary to accommodate the additional demand for water supply <br />and the pipe work is necessary to connect to our existing water supply. The original estimate was <br />prepared with a much greater amount of watermain that has since been Constructed as part of the <br />Sunwood Drive project and privately installed public infrastructure by the Developer. <br /> <br />Attached is a letter from our Consultant that recommends W.B. Miller, Inc for the contract as <br />they have successfully performed work of a similar nature in the past. <br /> <br />Recommendation: <br /> <br />It is Staff's recommendation to award the contract to W.B. Miller, Inc in the amount of <br />$85,942.50. <br /> <br />Council Action: <br /> <br />Motion to approve Resolution #04-09-XXX, aWarding Project #04-31, Construction of <br />Watermain associated with Well #6, to the lowest responsible bidder, W.B. Miller, Inc. <br /> <br />Reviewed by: <br />Director of Public Works/Fire Chief <br />City Administrato. r <br /> <br />CC: 09/13/04 <br /> <br />-365- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.