Laserfiche WebLink
# i.5 <br /> <br />RECEIVE BIDS AND AWARD coNTRACT FOR IMPROVEMENT PROJECT #04-31, <br /> CONSTRUCTION OF WATERMAIN ASSOCIATED WITH MUNICIPAL WELL #6 <br /> By: Brian E. Olson, Assistant Public Works Director / Principal City Engineer · <br /> <br />Background: <br /> <br />hnprovement Project #04-31 consists of the construction of 639 feet of watermain to connect <br />municipal Well #6 to Pumphouse #3 and modification of the Pumphouse associated with this <br />well. Authorization to advertise for bids was ordered on August 10, 2004, and bids were opened <br />on Tuesday, September 7, 2004. <br /> <br />Two (2) bids were received and ranged from $85,942.50 - $101,285.00. A summary of the <br />bidding is as follows: <br /> <br />Bidder <br />W.B. Miller, Inc <br />Dave Perkins Contracting, Inc. <br /> <br />Amount ofBid <br />$85,942.50 <br />$101,285.00 <br /> <br />Engineers Estimate: <br /> <br />.$185,000 <br /> <br />As part of the Master Development Agreement for the Ramsey Town Center, Well No.6 is one <br />of the three wells that were necessary to accommodate the additional demand for water supply <br />and the pipe work is necessary to connect to our existing water supply. The original estimate was <br />prepared with a much greater amount of watermain that has since been Constructed as part of the <br />Sunwood Drive project and privately installed public infrastructure by the Developer. <br /> <br />Attached is a letter from our Consultant that recommends W.B. Miller, Inc for the contract as <br />they have successfully performed work of a similar nature in the past. <br /> <br />Recommendation: <br /> <br />It is Staff's recommendation to award the contract to W.B. Miller, Inc in the amount of <br />$85,942.50. <br /> <br />Council Action: <br /> <br />Motion to approve Resolution #04-09-XXX, aWarding Project #04-31, Construction of <br />Watermain associated with Well #6, to the lowest responsible bidder, W.B. Miller, Inc. <br /> <br />Reviewed by: <br />Director of Public Works/Fire Chief <br />City Administrato. r <br /> <br />CC: 09/13/04 <br /> <br />-365- <br /> <br /> <br />