My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. EXECUTIVE SUMMARY <br /> City Improvement Project 17-02 proposes to reconstruct four street segments within the Rivers <br /> Bend residential neighborhood including 147th Lane between Xkimo Street and Waco Street, <br /> 148th Avenue between Yakima Street and Xkimo Street, Xkimo Street between 147th Lane and <br /> 149th Avenue, and Yakima Street between 148th Avenue and 149th Avenue. These streets total <br /> approximately 2,774 linear feet(0.53 miles) in length. A map showing the location and scope of <br /> the proposed improvements is included as Figure I in Appendix A. <br /> These street segments in the Rivers Bend neighborhood were constructed in 1985 with between 2 <br /> inches and 3.25 inches of bituminous pavement, 4 inches class 5 aggregate base, surmountable <br /> concrete curb and gutter, and concrete storm sewer. The street was constructed to a width of 30 <br /> feet from face-of-curb to face-of-curb, and is centered within a 60 foot wide right-of-way. The <br /> storm sewer system consists of catch basins which drain runoff from the street to low-lying areas <br /> using concrete storm sewer pipes. <br /> City staff evaluates and rates the condition of pavement sections on all city streets on an annual <br /> basis using the Pavement and Surface Evaluation Rating (PASER) system. In the fall of 2016, <br /> these street segments within the Rivers Bend neighborhood were rated with PASER ratings of 3, <br /> which indicates this street is past the point of applying mill and overlay improvements. The <br /> current condition of these streets requires City staff to patch the streets at least once per year, <br /> particularly before winter so the street can be plowed without further damaging the pavement in <br /> the process. Pictures of this street segment are located in Appendix A. <br /> Proposed improvements include removing and replacing all damaged concrete curb and gutter <br /> sections, and reconstructing the existing bituminous pavement section using a process called Full <br /> Depth Reclamation, or FDR. For this project, the FDR process would involve milling the entire <br /> existing bituminous pavement section, along with about 1 inch of the existing aggregate base. <br /> This reclaim material would then be placed on top of the reshaped and compacted subgrade, after <br /> which 3.5 inches of bituminous pavement would be placed on top. This would result in a 7-ton <br /> pavement design, which is a typical design for residential streets. <br /> The existing storm sewer system is in good condition. Only casting adjustments are proposed. <br /> The engineer's opinion of probable costs for completing the proposed improvements on Rivers <br /> Bend as outlined in this report is $283,000. Estimated costs include 23% indirect costs for <br /> administrative, engineering, finance and legal costs. A summary of the engineer's opinion of <br /> probable costs is included in Appendix B. <br /> A total of 44 parcels have been identified as receiving special benefit from the improvements. <br /> These parcels are identified in the preliminary Assessment Map and Roll which are attached in <br /> Appendix C. <br /> A total of twelve pavement corings were completed by WSB and Associates (WSB)to assist <br /> with the preparation of this report. WSB offered pavement design recommendations which were <br /> considered and incorporated to varying degrees while preparing this report. A copy of WSB's <br /> report is attached in Appendix D. <br /> Feasibility Report <br /> Rivers Bend Street Reconstructions <br /> City ofRamsey Project No.I7-02 Page 1 <br />