Laserfiche WebLink
This improvement project, which is listed in the City's current Capital Improvement Program, is <br /> proposed to be funded using a combination of special assessments to benefiting properties, street <br /> reconstructions bond proceeds, and stormwater utility funds. <br /> Staff recommends using special assessments to pay for 25% of eligible improvement costs, <br /> which will be applied across 44 assessable properties using the "per lot"method of assessment, <br /> which is the typical method used for single family parcels having approximately the same size. <br /> All costs for this project are eligible for special assessments since the street is proposed to be <br /> reconstructed at its existing width, and since the existing and proposed pavement sections both <br /> meet 7-ton design standards meaning they are equivalent sections. This project does not include <br /> any ineligible project costs related to the use of special assessments. <br /> Staff recommends ordering a special benefit consultation report for this project to verify that the <br /> proposed assessment amounts will not exceed the amount of benefit to any of these properties. If <br /> the report concludes that the benefit to any of the properties is less than the proposed preliminary <br /> assessment rate, Staff would propose to lower the assessment rate accordingly at the Assessment <br /> Hearing. However, if the special benefit consultation report verifies that the assessment rates as <br /> proposed are justified, Staff would propose to adopt the final assessment roll using the rate as <br /> preliminarily proposed. <br /> Staff has not yet had an opportunity to discuss the proposed improvements or the use of special <br /> assessments to pay for a portion of the improvements with impacted property owners. However, <br /> prior to the Public Hearing Staff will contact and offer to meet with impacted property owners <br /> for the purpose of explaining the proposed improvements, how special assessments are proposed <br /> to be applied, and to discuss the proposed improvements in more detail and to gather their input <br /> on the project, including any information that should be explored in more detail during <br /> development of plans and specifications. Staff would then present this information to Council <br /> during the Public Hearing. <br /> This project is necessary, feasible, and cost-effective from an engineering standpoint, and can be <br /> constructed as proposed herein. However, it would be most cost-effective to construct this <br /> project in conjunction with the Stanhope Terrace Street Reconstructions project, which is <br /> currently scheduled for construction in 2018. <br /> Feasibility Report <br /> Rivers Bend Street Reconstructions <br /> City ofRamsey Project No.I7-02 Page 2 <br />