My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. PROPOSED IMPROVEMENTS <br /> 4.1 Street and Stormwater Improvements <br /> The four street segments within the Rivers Bend residential neighborhood proposed to be <br /> reconstructed include 147th Lane between Xkimo Street and Waco Street, 148th Avenue <br /> between Yakima Street and Xkimo Street, Xkimo Street between 147th Lane and 149th Avenue, <br /> and Yakima Street between 148th Avenue and 149th Avenue. <br /> The scope of the proposed surface improvements is shown in Figure I in Appendix A. <br /> 4.1.1 Street Improvements <br /> The streets in Rivers Bend are proposed to be reconstructed to match their existing width <br /> of 30 feet. All damaged surmountable concrete curb and gutter is proposed to be <br /> removed and replaced in kind. A typical section for the proposed pavement street <br /> reconstructions improvements is shown in Figure 2 in Appendix A. <br /> The proposed reconstructed bituminous pavement design is designed to accommodate a <br /> 7-ton design in accordance with the City of Ramsey's design standards. City staff is <br /> proposing a pavement section design of 1.5 inches bituminous wear course, 2 inches <br /> bituminous base course, over 4 inches of existing aggregate base material after reshaping <br /> and compacting the base. <br /> The proposed pavement design should result in a minimum pavement life of 30 years, <br /> assuming that proactive, regular pavement maintenance treatments are performed during <br /> the life of the pavement. While a 60-year design life would typically be targeted for a <br /> reconstructed street, this project is not proposing a full street reconstruction due to the <br /> good condition of the majority of the existing 30 year old curb and gutter. Therefore, <br /> only the bituminous pavement is proposed to be reconstructed at this time as it may make <br /> sense to replace the pavement section at the time the rest of the existing curb and gutter is <br /> replaced, which may be 30 or more years in the future. <br /> 4.1.2 Stormsewer Improvements <br /> The existing storm sewer system is in good condition and is not proposed to be improved. <br /> The only proposed storm sewer improvements include repairing catch basin castings as <br /> needed. No stormwater quality treatment improvements are required for this project <br /> since the street is proposed to be reconstructed at its current width. <br /> 4.1.3 Geotechnical Considerations <br /> WSB completed twelve (12)pavement cores along the streets in Rivers Bend as shown in <br /> their Pavement Evaluations and Recommendations report, attached in Appendix D. WSB <br /> recommends leaving all intact existing curb and gutter in place, which staff estimates <br /> accounts for over 80% of the existing curb and gutter, which is only 30 years old. WSB <br /> also recommends reconstructing only the bituminous pavement. In total,this work is <br /> estimated to cost about half as much as a total street reconstructions while resulting in a <br /> Feasibility Report <br /> Rivers Bend Street Reconstructions <br /> City ofRamsey Project No.I7-02 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.