My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pavement design life of 30-plus years. In considering that the remaining curb and gutter <br /> will likely need to be replaced in around 30 years, a total street reconstructions could be <br /> evaluated at that time. Another benefit to this design is that it would result in minimal <br /> impacts to site access and traffic during construction. <br /> 4.1.4 Other Considerations <br /> Driveways: <br /> Existing driveways will need to be reconstructed to varying degrees. The limits of <br /> construction will vary with each driveway based on the elevations of the street and the <br /> parking lot, as well as the driveway pavement type. During design, staff will evaluate the <br /> construction limits for each driveway and will incorporate this into the plans, but as with <br /> all street reconstruction projects the exact limits of construction will be determined in the <br /> field during construction. Right-of-entry forms would be obtained from private property <br /> owners if work is required outside City right-of-ways and easements. <br /> Irri at�Systems: <br /> Developed properties along the project corridor may have private irrigation systems. <br /> Impacts to these systems may occur where the existing curb and gutter is being replaced. <br /> On past street reconstruction projects, the City repaired private irrigation systems that <br /> were damaged as part of the project. Staff recommends foregoing this practice on future <br /> projects. Instead, staff recommends notifying property owners in writing of the pending <br /> construction as far in advance of construction as possible to allow them to move their <br /> irrigation systems out of the construction area, and then replace it once work is complete. <br /> Parking Restrictions: <br /> Parking is currently allowed along both sides of the streets except for overnight parking <br /> per City code. During this project, parking is proposed to be restricted during allowable <br /> working hours also. <br /> 4.2 Stormwater Treatment <br /> Stormwater retention and/or treatment improvements are not required for this project. <br /> 4.3 Water Main Improvements <br /> No watermain improvements are proposed with this project. <br /> 4.4 Sanitary Sewer Improvements <br /> No sanitary sewer improvements are proposed with this project. <br /> 4.5 Construction Methods <br /> The existing bituminous pavement section will be reconstructed as outlined within this report. <br /> Feasibility Report <br /> Rivers Bend Street Reconstructions <br /> City ofRamsey Project No.I7-02 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.